The design of the anchoring of the steel double track railway integral bridge in Mechelen contrasting the historical Vierendeel bridges

The design of the anchoring of the steel double track railway integral bridge in Mechelen contrasting the historical Vierendeel bridges
Author(s):
Presented at IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, published in , pp. 484-490
DOI: 10.2749/prague.2022.0484
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.13 MB

In extending the existing railway infrastructure from Brussels to Antwerp, a new double track railway infrastructure has been built as a by-pass along the station in the city of Mechelen. In combin...
Read more

Bibliographic Details

Author(s): (Ghent University, Civil Engineering Department, Ghent and TUC RAIL Ltd., Brussels, Belgium)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Published in:
Page(s): 484-490 Total no. of pages: 7
Page(s): 484-490
Total no. of pages: 7
DOI: 10.2749/prague.2022.0484
Abstract:

In extending the existing railway infrastructure from Brussels to Antwerp, a new double track railway infrastructure has been built as a by-pass along the station in the city of Mechelen. In combination with these works, also a road infrastructure, further called the tangent road, was also constructed in which both infrastructures were bundled to the maximum. In crossing a local canal a new railway bridge is designed parallel to historical steel Vierendeel bridges and on top of the new tangent road tunnel going underneath the canal. The paper describes the final design and realization of the new railway bridge contrasting in all its aspects to the Vierendeel bridges with riveted bolt connections. The bridge consists of two lateral main girders having variable rectangular sections and is designed as an integral clamped structure without any bearings. The superstructure is fully welded and the main box girders have a maximum height of 3.65 m near the abutments. The lower flange remains almost horizontal and is slightly twisted about a horizontal axis thus becoming wider near the centre. The upper flange decreases significantly and becomes smaller near mid span where the box girder has a height of 1.65 m. This creates a waving pattern of the structure both in a horizontal plane as in the front view showing an inversed curvature near to the arch springs of the Vierendeel bridges. The concept differs from a more classical integral bridge by the extreme large stiffness of the abutments on top of the tunnel consisting of diaphragm walls. The steel structure is hereby almost perfectly clamped by post tensioning anchors.

Keywords:
integral bridge steel railway bridge clamping