0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The design of the anchoring of the steel double track railway integral bridge in Mechelen contrasting the historical Vierendeel bridges

The design of the anchoring of the steel double track railway integral bridge in Mechelen contrasting the historical Vierendeel bridges
Auteur(s):
Présenté pendant IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, publié dans , pp. 484-490
DOI: 10.2749/prague.2022.0484
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.13 MB

In extending the existing railway infrastructure from Brussels to Antwerp, a new double track railway infrastructure has been built as a by-pass along the station in the city of Mechelen. In combin...
Lire plus

Détails bibliographiques

Auteur(s): (Ghent University, Civil Engineering Department, Ghent and TUC RAIL Ltd., Brussels, Belgium)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Publié dans:
Page(s): 484-490 Nombre total de pages (du PDF): 7
Page(s): 484-490
Nombre total de pages (du PDF): 7
DOI: 10.2749/prague.2022.0484
Abstrait:

In extending the existing railway infrastructure from Brussels to Antwerp, a new double track railway infrastructure has been built as a by-pass along the station in the city of Mechelen. In combination with these works, also a road infrastructure, further called the tangent road, was also constructed in which both infrastructures were bundled to the maximum. In crossing a local canal a new railway bridge is designed parallel to historical steel Vierendeel bridges and on top of the new tangent road tunnel going underneath the canal. The paper describes the final design and realization of the new railway bridge contrasting in all its aspects to the Vierendeel bridges with riveted bolt connections. The bridge consists of two lateral main girders having variable rectangular sections and is designed as an integral clamped structure without any bearings. The superstructure is fully welded and the main box girders have a maximum height of 3.65 m near the abutments. The lower flange remains almost horizontal and is slightly twisted about a horizontal axis thus becoming wider near the centre. The upper flange decreases significantly and becomes smaller near mid span where the box girder has a height of 1.65 m. This creates a waving pattern of the structure both in a horizontal plane as in the front view showing an inversed curvature near to the arch springs of the Vierendeel bridges. The concept differs from a more classical integral bridge by the extreme large stiffness of the abutments on top of the tunnel consisting of diaphragm walls. The steel structure is hereby almost perfectly clamped by post tensioning anchors.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.