Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg

 Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg
Author(s): , , ,
Presented at IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, published in , pp. 591-598
DOI: 10.2749/istanbul.2023.0591
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.57 MB

The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatig...
Read more

Bibliographic Details

Author(s): (HPIEngineering ZT GmbH Vienna, Austria)
(MCE GmbH, Linz, Austria)
(MCE GmbH, Linz, Austria)
(MCE GmbH, Linz, Austria)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Published in:
Page(s): 591-598 Total no. of pages: 8
Page(s): 591-598
Total no. of pages: 8
Year: 2023
DOI: 10.2749/istanbul.2023.0591
Abstract:

The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatigue damage it now needs to be replaced. The new design consists of two similar cable-stayed steel superstructures, each carrying four lanes. It has an overall length of 802 m, an overall width of almost 70 m, pylons of 90 m in height, and a central span of 380 m. The installation of the superstructure comprises incremental launching of the approaches, crane assembly of the pylons, and the cantilevered assembly method of the central span. Additionally, the requirement to maintain vehicular traffic on the A40 highway during the construction phase demands transversal launching of the southern bridge structure by 14.4 m after completion. This paper covers the design and implementation of the installation works of the steel structures on site.

Keywords:
cable-stayed bridge incremental launching construction practices of long-span bridges crane assembly large scale cantilevered assembly