Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg

 Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, publié dans , pp. 591-598
DOI: 10.2749/istanbul.2023.0591
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.57 MB

The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatig...
Lire plus

Détails bibliographiques

Auteur(s): (HPIEngineering ZT GmbH Vienna, Austria)
(MCE GmbH, Linz, Austria)
(MCE GmbH, Linz, Austria)
(MCE GmbH, Linz, Austria)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Publié dans:
Page(s): 591-598 Nombre total de pages (du PDF): 8
Page(s): 591-598
Nombre total de pages (du PDF): 8
Année: 2023
DOI: 10.2749/istanbul.2023.0591
Abstrait:

The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatigue damage it now needs to be replaced. The new design consists of two similar cable-stayed steel superstructures, each carrying four lanes. It has an overall length of 802 m, an overall width of almost 70 m, pylons of 90 m in height, and a central span of 380 m. The installation of the superstructure comprises incremental launching of the approaches, crane assembly of the pylons, and the cantilevered assembly method of the central span. Additionally, the requirement to maintain vehicular traffic on the A40 highway during the construction phase demands transversal launching of the southern bridge structure by 14.4 m after completion. This paper covers the design and implementation of the installation works of the steel structures on site.

Mots-clé:
Pont à haubans Poussage

Ouvrages et projets