Demolition of Fatigued Bridges with Movable Scaffolding Systems
|
Bibliographic Details
Author(s): |
M. Däbritz
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020 | ||||
Published in: | IABSE Symposium Wroclaw 2020 | ||||
|
|||||
Page(s): | 414-421 | ||||
Total no. of pages: | 8 | ||||
Year: | 2020 | ||||
DOI: | 10.2749/wroclaw.2020.0414 | ||||
Abstract: |
The central European highway-infrastructure of the 1960s and 1970s is characterized by increasing overstraining. Often, repair tasks only allow further usage for a limited amount of time. Deconstruction and replacement, particularly in ecologically sensitive areas and ones with a high amount of intersections, call for a plannable demolition method, which ensures that the interruption of traffic on the affected route section is minimalized. |
||||
Keywords: |
viaduct demolition MSS deconstruction Movable Scaffolding Systems replace
|