Demolition of Fatigued Bridges with Movable Scaffolding Systems

 Demolition of Fatigued Bridges with Movable Scaffolding Systems
Author(s):
Presented at IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020, published in , pp. 414-421
DOI: 10.2749/wroclaw.2020.0414
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 1.81 MB

The central European highway-infrastructure of the 1960s and 1970s is characterized by increasing overstraining. Often, repair tasks only allow further usage for a limited amount of time. Deconstru...
Read more

Bibliographic Details

Author(s):
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Synergy of Culture and Civil Engineering – History and Challenges, Wrocław, Poland, 7-9 October 2020
Published in:
Page(s): 414-421 Total no. of pages: 8
Page(s): 414-421
Total no. of pages: 8
Year: 2020
DOI: 10.2749/wroclaw.2020.0414
Abstract:

The central European highway-infrastructure of the 1960s and 1970s is characterized by increasing overstraining. Often, repair tasks only allow further usage for a limited amount of time. Deconstruction and replacement, particularly in ecologically sensitive areas and ones with a high amount of intersections, call for a plannable demolition method, which ensures that the interruption of traffic on the affected route section is minimalized.

Keywords:
viaduct demolition MSS deconstruction Movable Scaffolding Systems replace