The new Inner Harbour Bridge in Copenhagen is innovative both in its method of opening and a number of its design features. The moving bridge comprises two steel box girders that retract by sliding...
Read more

Bibliographic Details

Author(s): (Flint & Neill Ltd., London, UK)
(Flint & Neill Ltd., London, UK)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2368-2374 Total no. of pages: 7
Page(s): 2368-2374
Total no. of pages: 7
Year: 2016
DOI: 10.2749/stockholm.2016.2359
Abstract:

The new Inner Harbour Bridge in Copenhagen is innovative both in its method of opening and a number of its design features. The moving bridge comprises two steel box girders that retract by sliding between fixed concrete approach spans. The steel box girders are of a highly unusual form involving plan curvature, continually changing cross sections and a faceted – or triangulated – inner web. Furthermore, because of the support arrangement, the girders go from cantilevering to simply-supported conditions over the course of an opening cycle.

The dynamic response of the box girders, with 35 m cantilevering spans in the service condition, presented a challenge which was addressed in the design by a combination of rationalised design criteria and the application of a series of tuned mass dampers.

The project has been delayed for a variety of reasons, not least due to the original contractor going into liquidation part way through, and the fixed concrete spans were modified by adding a new composite top layer of reinforced concrete following the original casting.

This paper touches briefly on the unique form and opening mechanism of the bridge and then turns to the details of some of the novel structural aspects.