Copenhagen Inner Harbour Bridge

 Copenhagen Inner Harbour Bridge
Auteur(s): ,
Présenté pendant IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, publié dans , pp. 2368-2374
DOI: 10.2749/stockholm.2016.2359
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

The new Inner Harbour Bridge in Copenhagen is innovative both in its method of opening and a number of its design features. The moving bridge comprises two steel box girders that retract by sliding...
Lire plus

Détails bibliographiques

Auteur(s): (Flint & Neill Ltd., London, UK)
(Flint & Neill Ltd., London, UK)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Publié dans:
Page(s): 2368-2374 Nombre total de pages (du PDF): 7
Page(s): 2368-2374
Nombre total de pages (du PDF): 7
Année: 2016
DOI: 10.2749/stockholm.2016.2359
Abstrait:

The new Inner Harbour Bridge in Copenhagen is innovative both in its method of opening and a number of its design features. The moving bridge comprises two steel box girders that retract by sliding between fixed concrete approach spans. The steel box girders are of a highly unusual form involving plan curvature, continually changing cross sections and a faceted – or triangulated – inner web. Furthermore, because of the support arrangement, the girders go from cantilevering to simply-supported conditions over the course of an opening cycle.

The dynamic response of the box girders, with 35 m cantilevering spans in the service condition, presented a challenge which was addressed in the design by a combination of rationalised design criteria and the application of a series of tuned mass dampers.

The project has been delayed for a variety of reasons, not least due to the original contractor going into liquidation part way through, and the fixed concrete spans were modified by adding a new composite top layer of reinforced concrete following the original casting.

This paper touches briefly on the unique form and opening mechanism of the bridge and then turns to the details of some of the novel structural aspects.