0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparison of Two Ways of Payment in Construction Contract

Author(s):

Medium: conference paper
Language(s): English
Conference: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Published in:
Page(s): 1463-1466
DOI: 10.4028/www.scientific.net/AMM.209-211.1463
Abstract:

The engineering payment is “the life blood” of construction industry, which is the core of the whole engineering contract, the foundation of carrying out construction and the root of many of its problems solved. Also, it is one of the important reasons resulted in disputes. So it is essential to select appreciate payment way according to special engineering, and it get twice the result with half the effort.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.4028/www.scientific.net/AMM.209-211.1463.
  • About this
    data sheet
  • Reference-ID
    10327258
  • Published on:
    24/07/2019
  • Last updated on:
    24/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine