Comparison of Two Ways of Payment in Construction Contract
Auteur(s): |
Su Lei Li
Dan Feng Xie |
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China) |
Publié dans: | Sustainable Cities Development and Environment [3 vols] |
Page(s): | 1463-1466 |
DOI: | 10.4028/www.scientific.net/AMM.209-211.1463 |
Abstrait: |
The engineering payment is “the life blood” of construction industry, which is the core of the whole engineering contract, the foundation of carrying out construction and the root of many of its problems solved. Also, it is one of the important reasons resulted in disputes. So it is essential to select appreciate payment way according to special engineering, and it get twice the result with half the effort. |
- Informations
sur cette fiche - Reference-ID
10327258 - Publié(e) le:
24.07.2019 - Modifié(e) le:
24.07.2019