0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Chacao Suspension Bridge: Tender and Technical Challenges

 Chacao Suspension Bridge: Tender and Technical Challenges
Author(s): ,
Presented at IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, published in , pp. 2516-2523
DOI: 10.2749/222137814814069327
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.12 MB

Since the 90s it has studied a fixed connection from the Chiloé Island to the mainland of Chile, in the region of Los Lagos - Chile, by a bridge. In 2005, an approach to the construction gave way ...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Published in:
Page(s): 2516-2523 Total no. of pages: 8
Page(s): 2516-2523
Total no. of pages: 8
Year: 2014
DOI: 10.2749/222137814814069327
Abstract:

Since the 90s it has studied a fixed connection from the Chiloé Island to the mainland of Chile, in the region of Los Lagos - Chile, by a bridge. In 2005, an approach to the construction gave way to a tender under the Private Public Partnership (PPP) model, but it had an early termination in the engineering phase due to investment exceeding the pre estimated amount. In 2012 a revaluation of the project changed the bussiness model to a “Design & Build“ contract within the procurement system that is traditional for the state of Chile.

The Chacao bridge corresponds to a suspension bridge typology, with multi-span (three pylons) and with a total lenght of 2.6 km, located in one of the highest earthquake zone in the world, (intensity of Mw 9.5) and subject to heavy wind loads and large-scale marine current.

The paper discusses the new bidding process and technicals analysis of the background reference developed for the bridge over the Chacao channel. It analyzes the main technical elements of the bridge in relation to the load applied, regulations and contracting method chosen. Finally, it presents the guidelines and selection criteria for the definition of the largest public work tendered in Chile up to now, framed by relevant economic and technical facts (design, construction and maintenance).

Keywords:
design bridge suspension maintenance tender monitoring

Structures and Projects

Structure Types