Case Study Analysis of Wharf Repair Projects

 Case Study Analysis of Wharf Repair Projects
Author(s): , ,
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S15-9
DOI: 10.2749/nantes.2018.s15-9
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.36 MB

This paper will review the project life cycle of two concrete wharf rehabilitation projects completed in the past 4 years. A particular focus will be made on challenging technical aspects, particul...
Read more

Bibliographic Details

Author(s): (Freyssinet International & Cie, Rueil-Malmaison, France)
(Freyssinet Australia Pty Ltd, Melbourne, Victoria, Australia)
(Freyssinet France, Rueil-Malmaison, France)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S15-9 Total no. of pages: 9
Page(s): S15-9
Total no. of pages: 9
DOI: 10.2749/nantes.2018.s15-9
Abstract:

This paper will review the project life cycle of two concrete wharf rehabilitation projects completed in the past 4 years. A particular focus will be made on challenging technical aspects, particularly on the implementation of impressed current cathodic protection (ICCP) systems, as well as the preferred methods that were adopted to achieve requirements. These requirements will also be discussed in the context of applicable warranties, maintenance and achieving the desired design life.

Keywords:
durability rehabilitation design life cathodic protection concrete repair