Case Study Analysis of Wharf Repair Projects
|
Bibliographic Details
Author(s): |
Xavier Hallopeau
(Freyssinet International & Cie, Rueil-Malmaison, France)
Nick Critchley (Freyssinet Australia Pty Ltd, Melbourne, Victoria, Australia) Olivier Lesieutre (Freyssinet France, Rueil-Malmaison, France) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Published in: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Page(s): | S15-9 | ||||
Total no. of pages: | 9 | ||||
DOI: | 10.2749/nantes.2018.s15-9 | ||||
Abstract: |
This paper will review the project life cycle of two concrete wharf rehabilitation projects completed in the past 4 years. A particular focus will be made on challenging technical aspects, particularly on the implementation of impressed current cathodic protection (ICCP) systems, as well as the preferred methods that were adopted to achieve requirements. These requirements will also be discussed in the context of applicable warranties, maintenance and achieving the desired design life. |
||||
Keywords: |
durability rehabilitation design life cathodic protection concrete repair
|