Case Study Analysis of Wharf Repair Projects
|
Détails bibliographiques
Auteur(s): |
Xavier Hallopeau
(Freyssinet International & Cie, Rueil-Malmaison, France)
Nick Critchley (Freyssinet Australia Pty Ltd, Melbourne, Victoria, Australia) Olivier Lesieutre (Freyssinet France, Rueil-Malmaison, France) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Publié dans: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Page(s): | S15-9 | ||||
Nombre total de pages (du PDF): | 9 | ||||
DOI: | 10.2749/nantes.2018.s15-9 | ||||
Abstrait: |
This paper will review the project life cycle of two concrete wharf rehabilitation projects completed in the past 4 years. A particular focus will be made on challenging technical aspects, particularly on the implementation of impressed current cathodic protection (ICCP) systems, as well as the preferred methods that were adopted to achieve requirements. These requirements will also be discussed in the context of applicable warranties, maintenance and achieving the desired design life. |