Calculation Method of the Uncertainty Duration of Construction Projects

Author(s):

Medium: conference paper
Language(s): English
Conference: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Published in:
Page(s): 1411-1414
DOI: 10.4028/www.scientific.net/AMM.209-211.1411
Abstract:

The duration of construction project is of great uncertainty because the construction project is of large scale, its construction cycle is long, it takes much consumption in material resources, human and financial resources, it is of complicated cases, and there are also many unpredictable factors. A method to determine the uncertainty duration whose chief path is not a single one is raised combining with engineering practices in this thesis.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.4028/www.scientific.net/AMM.209-211.1411.
  • About this
    data sheet
  • Reference-ID
    10327248
  • Published on:
    24/07/2019
  • Last updated on:
    24/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine