Calculation Method of the Uncertainty Duration of Construction Projects
Autor(en): |
Fu Liang Wang
Xue Dong Xu |
---|---|
Medium: | Tagungsbeitrag |
Sprache(n): | Englisch |
Tagung: | 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China) |
Veröffentlicht in: | Sustainable Cities Development and Environment [3 vols] |
Seite(n): | 1411-1414 |
DOI: | 10.4028/www.scientific.net/AMM.209-211.1411 |
Abstrakt: |
The duration of construction project is of great uncertainty because the construction project is of large scale, its construction cycle is long, it takes much consumption in material resources, human and financial resources, it is of complicated cases, and there are also many unpredictable factors. A method to determine the uncertainty duration whose chief path is not a single one is raised combining with engineering practices in this thesis. |
- Über diese
Datenseite - Reference-ID
10327248 - Veröffentlicht am:
24.07.2019 - Geändert am:
24.07.2019