0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cable replacement of Fernando Reig Bridge in Alcoy, Alicante

 Cable replacement of Fernando Reig Bridge in Alcoy, Alicante
Author(s): , , , ,
Presented at IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, published in , pp. 1000-1008
DOI: 10.2749/newdelhi.2023.1000
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.99 MB

This paper summarizes the cable replacement works carried out at this cable-stayed bridge constructed in the city of Alcoy (Spain} that was reopened to vehicular and pedestrian traffic in April 201...
Read more

Bibliographic Details

Author(s): (FHECOR lngenieros Consultores, Madrid, SPAlN)
(FHECOR lngenieros Consultores, Madrid, SPAlN)
(FHECOR lngenieros Consultores, Madrid, SPAlN)
(FHECOR lngenieros Consultores, Madrid, SPAlN)
(FHECOR lngenieros Consultores, Madrid, SPAlN)
(FHECOR lngenieros Consultores, Madrid, SPAlN)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Published in:
Page(s): 1000-1008 Total no. of pages: 9
Page(s): 1000-1008
Total no. of pages: 9
DOI: 10.2749/newdelhi.2023.1000
Abstract:

This paper summarizes the cable replacement works carried out at this cable-stayed bridge constructed in the city of Alcoy (Spain} that was reopened to vehicular and pedestrian traffic in April 2018, 31 years after its inauguration. The sequence followed for the cable replacement and the lessons learned this procedure are explained at length. The authors believe that the transmission of this experience can help others to technically manage similar bridges not only in Spain but all over the world.

Keywords:
replacement cable injected with grout cable break autopsy

Structures and Projects