Cable replacement of Fernando Reig Bridge in Alcoy, Alicante
|
Bibliografische Angaben
Autor(en): |
Javier Torrico
(FHECOR lngenieros Consultores, Madrid, SPAlN)
Hugo Corres (FHECOR lngenieros Consultores, Madrid, SPAlN) Javier Leon (FHECOR lngenieros Consultores, Madrid, SPAlN) Julio Sánchez (FHECOR lngenieros Consultores, Madrid, SPAlN) Cristina Sanz (FHECOR lngenieros Consultores, Madrid, SPAlN) Gemma Fernández (FHECOR lngenieros Consultores, Madrid, SPAlN) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023 | ||||
Veröffentlicht in: | IABSE Congress New Delhi 2023 | ||||
|
|||||
Seite(n): | 1000-1008 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
DOI: | 10.2749/newdelhi.2023.1000 | ||||
Abstrakt: |
This paper summarizes the cable replacement works carried out at this cable-stayed bridge constructed in the city of Alcoy (Spain} that was reopened to vehicular and pedestrian traffic in April 2018, 31 years after its inauguration. The sequence followed for the cable replacement and the lessons learned this procedure are explained at length. The authors believe that the transmission of this experience can help others to technically manage similar bridges not only in Spain but all over the world. |