Burlington Bay Skyway Hanger Fail-Safe System

 Burlington Bay Skyway Hanger Fail-Safe System
Author(s): ORCID, ,
Presented at IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, published in , pp. 2720-2725
DOI: 10.2749/newyork.2019.2720
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.18 MB

The Burlington Bay Skyway was built in 1954 and rehabilitated in the 1980s. A continuous three span truss rises from below the deck up over the roadway across the 151 m central span over a navigati...
Read more

Bibliographic Details

Author(s): ORCID (Ontario Ministry of Transportation)
(Ontario Ministry of Transportation)
(Ontario Ministry of Transportation)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Published in:
Page(s): 2720-2725 Total no. of pages: 6
Page(s): 2720-2725
Total no. of pages: 6
DOI: 10.2749/newyork.2019.2720
Abstract:

The Burlington Bay Skyway was built in 1954 and rehabilitated in the 1980s. A continuous three span truss rises from below the deck up over the roadway across the 151 m central span over a navigational channel into Hamilton Harbour. The deck system hangs from the truss and the consequences of a hanger impact could be severe and include prolonged closure, impediment of the navigation channel, and could trigger a progressive collapse of the suspended deck system arising from simply supported stringers and floor trusses. The regional economic impact of bridge closure on one of Ontario’s major arteries is considerable.

The Ontario Ministry of Transportation (MTO) is adding redundancy trusses to transfer the load from the deck system to adjacent hangers in the event of hanger loss. Each truss runs longitudinally below the edge of the deck through the main span, within the depth of the existing transverse floor trusses. The proactive retrofit improves redundancy of the deck system and keeps the bridge serviceable and safe after hanger loss, in-line with current code requirements.

Keywords:
resilience redundancy truss cable impact hanger loss single load path