Brunei Temburong Link
|
Bibliographic Details
Author(s): |
Naeem Hussain
(Ove Arup & Partners, Hong Kong)
Sammy Yip (Ove Arup & Partners, Hong Kong) Murphy To (Ove Arup & Partners, Hong Kong) Kok Kong Chin (Ove Arup Dan Rakan-Rakan, Brunei) Lee Sing Ding (Ove Arup Dan Rakan-Rakan, Brunei) Kheong Cheng Yat (Ove Arup Dan Rakan-Rakan, Brunei) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018 | ||||
Published in: | IABSE Conference Kuala Lumpur 2018 | ||||
|
|||||
Page(s): | 47-53 | ||||
Total no. of pages: | 7 | ||||
DOI: | 10.2749/kualalumpur.2018.0047 | ||||
Abstract: |
Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing link is being constructed to connect the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, followed by detail design and construction. This paper describes aspects of the feasibility study, detail design and construction |
||||
Keywords: |
alignment marine viaduct swamp viaduct cable-stay bridges pre-cast construction
|