0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Balanced Lift Method for Moveable Bridges

Author(s):


Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

Using the balanced lift method for bridge construction involves vertical assembly of the bridge girders. In order to rotate the bridge girders into the final horizontal position, compression struts are used and present an integral part of the finished bridge. This construction method has been patented worldwide. Currently four bridges are being designed and will be built in the course of the construction of the S7 motorway in Austria in 2012. Since the bridge parts are moved during the construction process it is quite obvious that this method can also be applied in the design of moveable bridges.

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065529
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine