0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Publié dans:
Année: 2011
Abstrait:

Using the balanced lift method for bridge construction involves vertical assembly of the bridge girders. In order to rotate the bridge girders into the final horizontal position, compression struts are used and present an integral part of the finished bridge. This construction method has been patented worldwide. Currently four bridges are being designed and will be built in the course of the construction of the S7 motorway in Austria in 2012. Since the bridge parts are moved during the construction process it is quite obvious that this method can also be applied in the design of moveable bridges.

Types d'ouvrages

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10065529
  • Publié(e) le:
    03.10.2011
  • Modifié(e) le:
    05.07.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine