Analysis of cable-stayed bridge construction

 Analysis of cable-stayed bridge construction
Author(s): ORCID, , ORCID
Presented at IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, published in , pp. 785-792
DOI: 10.2749/vancouver.2017.0785
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.23 MB

One of the most important causes of the rapid progress of cable-stayed bridges in recent decades is the development of the construction techniques that made their erection possible. Cantilever meth...
Read more

Bibliographic Details

Author(s): ORCID (Universidad de Castilla-La Mancha, Ciudad Real, Spain)
(Tongji University, Shanghai, China)
ORCID (Universitat Politècnica de Catalunya BarcelonaTECH, Barcelona, Spain)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Published in:
Page(s): 785-792 Total no. of pages: 8
Page(s): 785-792
Total no. of pages: 8
Year: 2017
DOI: 10.2749/vancouver.2017.0785
Abstract:

One of the most important causes of the rapid progress of cable-stayed bridges in recent decades is the development of the construction techniques that made their erection possible. Cantilever method and temporary support method are the most common procedures to build such bridges. The temporary support method is the fastest way of building cable-stayed bridges because conventional construction techniques may be used. This fact simplifies the erection task and leads to lower costs. However, when environmental factors or the requirements of the foundations or the sea or river crossing prevent the placement of temporary supports during construction, the cantilever erection method is commonly used. Focus on the research has been mainly devoted to the structural behavior of these structures under construction or service conditions, but the erection procedures and their calculations are not so studied. This paper aims to present practical tools to be used by the designer or the contractor for construction control of the tensioning process of the stays. Namely, a procedure to calculate the stress to be given to the first strand when the strand by strand tensioning technique is used and a procedure to update rationally the tensioning process of a cable stayed bridge when divergence between the foreseen stresses in the stays and the actual ones are noticeable.

Keywords:
cable-stayed bridge prestressing construction control Tensioning Process strand by strand technique objective service state