-
Zhang, Xueqing / Akber, Muhammad Zeshan / Poon, C. S. / Zheng, Wei (2023): Predicting the 28-day compressive strength by mix proportions: Insights from a large number of observations of industrially produced concrete. In: Construction and Building Materials, v. 400 (October 2023).
https://doi.org/10.1016/j.conbuildmat.2023.132754
-
Zhang, Xueqing / Akber, Muhammad Zeshan / Zheng, Wei (2022): Predicting the slump of industrially produced concrete using machine learning: A multiclass classification approach. In: Journal of Building Engineering, v. 58 (October 2022).
https://doi.org/10.1016/j.jobe.2022.104997
-
Zhang, Xueqing / Ahmed, Rana Rabnawaz (2022): A queuing system for inert construction waste management on a reverse logistics network. In: Automation in Construction, v. 137 (May 2022).
https://doi.org/10.1016/j.autcon.2022.104221
-
Zubair, Muhammad Umer / Zhang, Xueqing (2022): Investigation and Improvements of the Existing Best-Value Selection Criteria for Elevator Maintenance Contractors. In: Journal of Management in Engineering (ASCE), v. 38, n. 1 (January 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0000987
-
Zhang, Xueqing / Akber, Muhammad Zeshan / Zheng, Wei (2021): Prediction of seven-day compressive strength of field concrete. In: Construction and Building Materials, v. 305 (October 2021).
https://doi.org/10.1016/j.conbuildmat.2021.124604
-
Tariq, Salman / Zhang, Xueqing (2021): Socioeconomic, Macroeconomic, and Sociopolitical Issues in Water PPP Failures. In: Journal of Management in Engineering (ASCE), v. 37, n. 5 (September 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000947
-
Gao, Hui / Zhang, Xueqing (2013): A Markov-Based Road Maintenance Optimization Model Considering User Costs. In: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 6 (March 2013).
https://doi.org/10.1111/mice.12009
-
Zubair, Muhammad Umer / Zhang, Xueqing (2020): Hybrid Performance-Measurement Model of Elevators. In: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 2 (April 2020).
https://doi.org/10.1061/(asce)cf.1943-5509.0001406
-
Wu, Di / Zhang, Xueqing (2019): Improving As-built Records of Underground Utilities: Barriers and Solutions. In: International Journal of Architecture Engineering and Construction, v. 8, n. 2 (June 2019).
https://doi.org/10.7492/ijaec.2019.012
-
Zhang, Xueqing / Xiong, Wei (2015): Renegotiation and Early-Termination in Public Private Partnerships. In: International Journal of Architecture Engineering and Construction, v. 4, n. 4 (December 2015).
https://doi.org/10.7492/ijaec.2015.021
-
Zhang, Xueqing / Soomro, Mohsin Ali (2016): Failure Path Analysis with Respect to Private Sector Partners in Transportation Public-Private Partnerships. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000384
-
Soomro, Mohsin Ali / Zhang, Xueqing (2015): Roles of Private-Sector Partners in Transportation Public-Private Partnership Failures. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000263
-
Hu, Zhen / Chen, Shu / Zhang, Xueqing (2014): Value for money and its influential factors: an empirical study of PPP projects in Japan. In: Built Environment Project and Asset Management, v. 4, n. 2 (May 2014).
https://doi.org/10.1108/bepam-12-2012-0055
-
Cheung, Moe M. S. / So, Kevin K. L. / Zhang, Xueqing (2012): Life cycle cost management of concrete structures relative to chloride-induced reinforcement corrosion. In: Structure and Infrastructure Engineering, v. 8, n. 12 (December 2012).
https://doi.org/10.1080/15732479.2010.507474
-
Zhang, Xueqing (2004): Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:5(670)
-
Zhang, Xueqing (2005): Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(656)
-
Zhang, Xueqing (2009): Win–Win Concession Period Determination Methodology. In: Journal of Construction Engineering and Management, v. 135, n. 6 (June 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000012
-
Zhang, Xueqing (2005): Paving the Way for Public–Private Partnerships in Infrastructure Development. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:1(71)
-
Zhang, Xueqing / Gao, Hui (2010): Optimal Performance-Based Building Facility Management. In: Computer-Aided Civil and Infrastructure Engineering, v. 25, n. 4 (May 2010).
https://doi.org/10.1111/j.1467-8667.2009.00633.x
-
Li, Yashuai / Zhang, Xueqing (2013): Web-based construction waste estimation system for building construction projects. In: Automation in Construction, v. 35 (November 2013).
https://doi.org/10.1016/j.autcon.2013.05.002
-
Zhang, Xueqing (2006): Public Clients' Best Value Perspectives of Public Private Partnerships in Infrastructure Development. In: Journal of Construction Engineering and Management, v. 132, n. 2 (February 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:2(107)
-
Zhang, Xueqing (2006): Markov-Based Optimization Model for Building Facilities Management. In: Journal of Construction Engineering and Management, v. 132, n. 11 (November 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:11(1203)
-
Xiong, Wei / Zhang, Xueqing (2016): The Real Option Value of Renegotiation in Public–Private Partnerships. In: Journal of Construction Engineering and Management, v. 142, n. 8 (August 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001130