-
Zhang, Xuan / Zhang, Xueqing (2024): Automated component delivery management under uncertainty for prefabricated buildings to minimize cost and harmful emissions. Dans: Automation in Construction, v. 162 (juin 2024).
https://doi.org/10.1016/j.autcon.2024.105388
-
Zubair, Muhammad Umer / Zhang, Xueqing / Hassan, Muhammad Usman (2023): Aligning expectations and perceptions of elevator maintenance stakeholders: an application of expectation confirmation theory. Dans: Building Research & Information, v. 52, n. 4 (novembre 2023).
https://doi.org/10.1080/09613218.2023.2236252
-
Shi, Guanqun / Zhang, Xueqing (2022): Development of a Regulatory Mechanism for Key Stages in Public–Private Partnerships. Dans: Journal of Infrastructure Systems, v. 28, n. 3 (septembre 2022).
https://doi.org/10.1061/(asce)is.1943-555x.0000697
-
Zhang, Xueqing / Zubair, Muhammad Umer (2022): Extending the useful life of elevators through appropriate maintenance strategies. Dans: Journal of Building Engineering, v. 51 (juillet 2022).
https://doi.org/10.1016/j.jobe.2022.104347
-
Tariq, Salman / Zhang, Xueqing (2021): A critical analysis of water PPP failures in sub-Saharan Africa. Dans: Engineering, Construction and Architectural Management, v. 29, n. 8 (juillet 2021).
https://doi.org/10.1108/ecam-01-2021-0084
-
Besklubova, Svetlana / Skibniewski, Miroslaw J. / Zhang, Xueqing (2021): Factors Affecting 3D Printing Technology Adaptation in Construction. Dans: Journal of Construction Engineering and Management, v. 147, n. 5 (mai 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002034
-
Tariq, Salman / Zhang, Xueqing (2020): Critical Failure Drivers in International Water PPP Projects. Dans: Journal of Infrastructure Systems, v. 26, n. 4 (décembre 2020).
https://doi.org/10.1061/(asce)is.1943-555x.0000581
-
Tariq, Salman / Zhang, Xueqing (2021): Critical Analysis of the Private Sector Roles in Water PPP Failures. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002020
-
Zubair, Muhammad Umer / Zhang, Xueqing (2020): Explicit data-driven prediction model of annual energy consumed by elevators in residential buildings. Dans: Journal of Building Engineering, v. 31 (septembre 2020).
https://doi.org/10.1016/j.jobe.2020.101278
-
Zhang, Xueqing / Tariq, Salman (2020): Failure Mechanisms in International Water PPP Projects: A Public Sector Perspective. Dans: Journal of Construction Engineering and Management, v. 146, n. 6 (juin 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001837
-
Zhang, Xueqing / Gao, Hui (2012): Determining an Optimal Maintenance Period for Infrastructure Systems. Determining an optimal maintenance period. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 27, n. 7 (juillet 2012).
https://doi.org/10.1111/j.1467-8667.2011.00739.x
-
Zhang, Xueqing / Li, Yashuai / Wu, Di (2020): Developing an Underground Utility Occupation Index for Efficient Urban Utilities Planning. Dans: Journal of Construction Engineering and Management, v. 146, n. 5 (mai 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001810
-
Zhang, Xueqing / Wang, Liguang (2018): Causal Relationships of Risk Factors in PPP Waste-to-Energy Incineration Projects. Dans: International Journal of Architecture Engineering and Construction, v. 7, n. 3 (septembre 2018).
https://doi.org/10.7492/ijaec.2018.018
-
Zhang, Xueqing / Wu, Di (2017): Analysis of the Major Causes of Poor Quality As-built Records of Underground Utilities. Dans: International Journal of Architecture Engineering and Construction, v. 6, n. 3 (septembre 2017).
https://doi.org/10.7492/ijaec.2017.018
-
Wang, Liguang / Zhang, Xueqing (2017): Critical Risk Factors in PPP Waste-to-Energy Incineration Projects. Dans: International Journal of Architecture Engineering and Construction, v. 6, n. 2 (juin 2017).
https://doi.org/10.7492/ijaec.2017.012
-
Zhang, Xueqing (2012): Developing an Effective Bridge Facilities Management Optimization Model. Dans: International Journal of Architecture Engineering and Construction, v. 1, n. 3 (septembre 2012).
https://doi.org/10.7492/ijaec.2012.016
-
Wang, Liguang / Zhang, Xueqing (2019): Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 3 (mai 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000682
-
Wang, Liguang / Zhang, Xueqing (2018): Bayesian Analytics for Estimating Risk Probability in PPP Waste-to-Energy Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000658
-
Soomro, Mohsin Ali / Zhang, Xueqing (2016): Evaluation of the Functions of Public Sector Partners in Transportation Public-Private Partnerships Failures. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000387
-
Zhang, Xueqing (2005): Concessionaire's Financial Capability in Developing Build-Operate-Transfer Type Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 131, n. 10 (octobre 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1054)
-
Xiong, Wei / Zhang, Xueqing (2014): Concession Renegotiation Models for Projects Developed through Public-Private Partnerships. Dans: Journal of Construction Engineering and Management, v. 140, n. 5 (mai 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000843
-
Zhang, Xueqing (2005): Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships. Dans: Journal of Construction Engineering and Management, v. 131, n. 6 (juin 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(631)
-
Zhang, Xueqing (2004): Concessionaire Selection: Methods and Criteria. Dans: Journal of Construction Engineering and Management, v. 130, n. 2 (avril 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:2(235)
-
Zhang, Xueqing (2005): Critical Success Factors for Public–Private Partnerships in Infrastructure Development. Dans: Journal of Construction Engineering and Management, v. 131, n. 1 (janvier 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:1(3)
-
Zhang, Xueqing / Mao, Xiaoming / AbouRizk, Simaan M. (2009): Developing a knowledge management system for improved value engineering practices in the construction industry. Dans: Automation in Construction, v. 18, n. 6 (octobre 2009).
https://doi.org/10.1016/j.autcon.2009.03.004
-
Mao, Xiaoming / Zhang, Xueqing (2008): Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques. Dans: Journal of Construction Engineering and Management, v. 134, n. 5 (mai 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:5(371)
-
Mao, Xiaoming / Zhang, Xueqing / AbouRizk, Simaan M. (2009): Enhancing Value Engineering Process by Incorporating Inventive Problem-Solving Techniques. Dans: Journal of Construction Engineering and Management, v. 135, n. 5 (mai 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000001
-
Zhang, Xueqing (2006): Factor Analysis of Public Clients' Best-Value Objective in Public–Privately Partnered Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 9 (septembre 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:9(956)
-
Xiong, Wei / Zhang, Xueqing / Chen, Hongyu (2016): Early-Termination Compensation in Public–Private Partnership Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 4 (avril 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001084
-
Zhang, Xueqing / AbouRizk, Simaan M. (2006): Determining a reasonable concession period for private sector provision of public works and service. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 5 (mai 2006).
https://doi.org/10.1139/l06-010