Determining the Value of Standby Letter of Credit in Transfer Stage of a PPP Project to Control Concessionaire’s Opportunistic Behavior
Auteur(s): |
Liguang Wang
Xueqing Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Management in Engineering (ASCE), mai 2019, n. 3, v. 35 |
Page(s): | 04019003 |
DOI: | 10.1061/(asce)me.1943-5479.0000682 |
- Informations
sur cette fiche - Reference-ID
10371476 - Publié(e) le:
29.08.2019 - Modifié(e) le:
29.08.2019