0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zhang, Lihan / Lou, Jianmin / Fu, Yongcheng / Ding, Tianhuan (2024): Impacts of Management Approaches on Conflict Resolution Satisfaction: Conflict Strength Matters. In: KSCE Journal of Civil Engineering, v. 28, n. 6 (April 2024).

    https://doi.org/10.1007/s12205-024-0724-1

  2. Guo, Wenqian / Lu, Wenxue / Kang, Fei / Zhang, Lihan (2024): How to Foster Relational Behavior in Construction Projects: Direct and Mediating Effects of Contractual Complexity and Regulatory Focus. In: Journal of Construction Engineering and Management, v. 150, n. 4 (April 2024).

    https://doi.org/10.1061/jcemd4.coeng-13908

  3. Zhang, Lihan / Yao, Hongjiang / Fu, Yongcheng / Chen, Yongqiang (2023): Comparing Subjective and Objective Measurements of Contract Complexity in Influencing Construction Project Performance: Survey versus Machine Learning. In: Journal of Management in Engineering (ASCE), v. 39, n. 4 (July 2023).

    https://doi.org/10.1061/jmenea.meeng-5331

  4. Fu, Yongcheng / Xu, Chenglong / Zhang, Lihan / Chen, Yongqiang (2023): Control, coordination, and adaptation functions in construction contracts: A machine-coding model. In: Automation in Construction, v. 152 (August 2023).

    https://doi.org/10.1016/j.autcon.2023.104890

  5. Lu, Wenxue / Zhang, Lihan / Bai, Fan (2016): Bilateral learning model in construction claim negotiations. In: Engineering, Construction and Architectural Management, v. 23, n. 4 (July 2016).

    https://doi.org/10.1108/ecam-04-2014-0062

  6. Zhang, Lihan / Fenn, Peter / Fu, Yongcheng (2019): To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. In: Engineering, Construction and Architectural Management, v. 26, n. 3 (April 2019).

    https://doi.org/10.1108/ecam-05-2018-0219

  7. Wang, Peipei / Zhang, Lihan / Wang, Kun / Fenn, Peter (2021): Aetiology and Progression of Construction Disputes towards a Predictive Model. In: KSCE Journal of Civil Engineering, v. 25, n. 4 (March 2021).

    https://doi.org/10.1007/s12205-021-0728-z

  8. Zhang, Lihan / Fu, Yongcheng / Lu, Wenxue (2021): Contract Enforcement for Claimants’ Satisfaction with Construction Dispute Resolution: Moderating Role of Shadow of the Future, Fairness Perception, and Trust. In: Journal of Construction Engineering and Management, v. 147, n. 2 (February 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001981

  9. Yan, Ling / Zhang, Lihan (2020): Interplay of Contractual Governance and Trust in Improving Construction Project Performance: Dynamic Perspective. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000791

  10. Lu, Wenxue / Zhang, Lihan / Fu, Yongcheng (2016): Improving Subjective Value in Construction Claim Negotiations: Role of Behavioral Primers. In: Journal of Management in Engineering (ASCE), v. 32, n. 4 (July 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000428

  11. Lu, Wenxue / Zhang, Lei / Zhang, Lihan (2016): Effect of Contract Completeness on Contractors' Opportunistic Behavior and the Moderating Role of Interdependence. In: Journal of Construction Engineering and Management, v. 142, n. 6 (June 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001110

  12. Lu, Wenxue / Zhang, Lihan / Li, Zhi (2015): Influence of Negotiation Risk Attitude and Power on Behaviors and Outcomes When Negotiating Construction Claims. In: Journal of Construction Engineering and Management, v. 141, n. 2 (February 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000927

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine