- (2024): Automated Quality Inspection of Formwork Systems Using 3D Point Cloud Data. In: Buildings, v. 14, n. 4 (27 March 2024).
- Spatio-temporal optimization of construction elevator planning in high-rise building projects. In: Developments in the Built Environment, v. 17 (March 2024). (2024):
- Lifting Sequence Optimization of Luffing Tower Cranes Considering Motion Paths with Dynamic Programming. In: Journal of Construction Engineering and Management, v. 147, n. 10 (October 2021). (2021):
- (2020): Spatiotemporal Modeling of Lifting Task Scheduling for Tower Cranes With a Tabu Search and 4-D Simulation. In: Frontiers in Built Environment, v. 6 (January 2020).
- BIM-based estimation of vertical transportation demands during the construction of high-rise buildings. In: Automation in Construction, v. 110 (February 2020). (2020):
- Spatio-temporal planning for tower cranes in construction projects with simulated annealing. In: Automation in Construction, v. 111 (March 2020). (2020):