- (2024): Automated Quality Inspection of Formwork Systems Using 3D Point Cloud Data. Dans: Buildings, v. 14, n. 4 (27 mars 2024).
- Spatio-temporal optimization of construction elevator planning in high-rise building projects. Dans: Developments in the Built Environment, v. 17 (mars 2024). (2024):
- Lifting Sequence Optimization of Luffing Tower Cranes Considering Motion Paths with Dynamic Programming. Dans: Journal of Construction Engineering and Management, v. 147, n. 10 (octobre 2021). (2021):
- (2020): Spatiotemporal Modeling of Lifting Task Scheduling for Tower Cranes With a Tabu Search and 4-D Simulation. Dans: Frontiers in Built Environment, v. 6 (janvier 2020).
- BIM-based estimation of vertical transportation demands during the construction of high-rise buildings. Dans: Automation in Construction, v. 110 (février 2020). (2020):
- Spatio-temporal planning for tower cranes in construction projects with simulated annealing. Dans: Automation in Construction, v. 111 (mars 2020). (2020):