Kabeh Vaziri
- Project Planning for Construction under Uncertainty with Limited Resources. In: Journal of Construction Engineering and Management, v. 133, n. 4 (April 2007). (2007):
- Optimizing scheduling of post-earthquake electric power restoration tasks. In: Earthquake Engineering and Structural Dynamics, v. 36, n. 2 (February 2007). (2007):