Kabeh Vaziri
- Project Planning for Construction under Uncertainty with Limited Resources. Dans: Journal of Construction Engineering and Management, v. 133, n. 4 (avril 2007). (2007):
- Optimizing scheduling of post-earthquake electric power restoration tasks. Dans: Earthquake Engineering and Structural Dynamics, v. 36, n. 2 (février 2007). (2007):