0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mario Vanhoucke

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Cheraghi, Esmail / Zohrehvandi, Shakib / Vanhoucke, Mario / Mohamadpour Tosarkani, Babak (2022): A multiproject scheduling and resource management model in projects construction. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (March 2022).

    https://doi.org/10.1108/ecam-02-2021-0177

  2. Barrientos-Orellana, Alexis / Ballesteros-Pérez, Pablo / Mora-Melià, Daniel / González-Cruz, María Carmen / Vanhoucke, Mario: Stability and accuracy of deterministic project duration forecasting methods in earned value management. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-12-2020-1045

  3. Zohrehvandi, Shakib / Vanhoucke, Mario / Soltani, Roya / Javadi, Mehrdad (2020): A reconfigurable model for implementation in the closing phase of a wind turbines project construction. In: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020).

    https://doi.org/10.1108/ecam-01-2019-0065

  4. Martens, Annelies / Vanhoucke, Mario (2020): Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000806

  5. Ballesteros-Pérez, Pablo / Cerezo-Narváez, Alberto / Otero-Mateo, Manuel / Pastor-Fernández, Andrés / Vanhoucke, Mario (2019): Performance comparison of activity sensitivity metrics in schedule risk analysis. In: Automation in Construction, v. 106 (October 2019).

    https://doi.org/10.1016/j.autcon.2019.102906

  6. de Andrade, Paulo André / Martens, Annelies / Vanhoucke, Mario (2019): Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. In: Automation in Construction, v. 99 (March 2019).

    https://doi.org/10.1016/j.autcon.2018.11.030

  7. Vanhoucke, Mario (2006): Work Continuity Constraints in Project Scheduling. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(14)

  8. Wauters, Mathieu / Vanhoucke, Mario (2015): Study of the Stability of Earned Value Management Forecasting. In: Journal of Construction Engineering and Management, v. 141, n. 4 (April 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000947

  9. Wauters, Mathieu / Vanhoucke, Mario (2014): Support Vector Machine Regression for project control forecasting. In: Automation in Construction, v. 47 (November 2014).

    https://doi.org/10.1016/j.autcon.2014.07.014

  10. Batselier, Jordy / Vanhoucke, Mario (2015): Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost. In: Journal of Construction Engineering and Management, v. 141, n. 11 (November 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001008

  11. Colin, Jeroen / Vanhoucke, Mario (2016): Empirical Perspective on Activity Durations for Project-Management Simulation Studies. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001022

  12. Martens, Annelies / Vanhoucke, Mario (2018): An empirical validation of the performance of project control tolerance limits. In: Automation in Construction, v. 89 (May 2018).

    https://doi.org/10.1016/j.autcon.2018.01.002

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine