Mario Vanhoucke
- A multiproject scheduling and resource management model in projects construction. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (March 2022). (2022):
- Stability and accuracy of deterministic project duration forecasting methods in earned value management. In: Engineering, Construction and Architectural Management. :
- A reconfigurable model for implementation in the closing phase of a wind turbines project construction. In: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020). (2020):
- Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020). (2020):
- Performance comparison of activity sensitivity metrics in schedule risk analysis. In: Automation in Construction, v. 106 (October 2019). (2019):
- Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. In: Automation in Construction, v. 99 (March 2019). (2019):
- Work Continuity Constraints in Project Scheduling. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006). (2006):
- Study of the Stability of Earned Value Management Forecasting. In: Journal of Construction Engineering and Management, v. 141, n. 4 (April 2015). (2015):
- Support Vector Machine Regression for project control forecasting. In: Automation in Construction, v. 47 (November 2014). (2014):
- Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost. In: Journal of Construction Engineering and Management, v. 141, n. 11 (November 2015). (2015):
- Empirical Perspective on Activity Durations for Project-Management Simulation Studies. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016). (2016):
- An empirical validation of the performance of project control tolerance limits. In: Automation in Construction, v. 89 (May 2018). (2018):