Mario Vanhoucke

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Cheraghi, Esmail / Zohrehvandi, Shakib / Vanhoucke, Mario / Mohamadpour Tosarkani, Babak (2022): A multiproject scheduling and resource management model in projects construction. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022).

    https://doi.org/10.1108/ecam-02-2021-0177

  2. Barrientos-Orellana, Alexis / Ballesteros-Pérez, Pablo / Mora-Melià, Daniel / González-Cruz, María Carmen / Vanhoucke, Mario: Stability and accuracy of deterministic project duration forecasting methods in earned value management. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-12-2020-1045

  3. Zohrehvandi, Shakib / Vanhoucke, Mario / Soltani, Roya / Javadi, Mehrdad (2020): A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Dans: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020).

    https://doi.org/10.1108/ecam-01-2019-0065

  4. Martens, Annelies / Vanhoucke, Mario (2020): Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 5 (septembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000806

  5. Ballesteros-Pérez, Pablo / Cerezo-Narváez, Alberto / Otero-Mateo, Manuel / Pastor-Fernández, Andrés / Vanhoucke, Mario (2019): Performance comparison of activity sensitivity metrics in schedule risk analysis. Dans: Automation in Construction, v. 106 (octobre 2019).

    https://doi.org/10.1016/j.autcon.2019.102906

  6. de Andrade, Paulo André / Martens, Annelies / Vanhoucke, Mario (2019): Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. Dans: Automation in Construction, v. 99 (mars 2019).

    https://doi.org/10.1016/j.autcon.2018.11.030

  7. Vanhoucke, Mario (2006): Work Continuity Constraints in Project Scheduling. Dans: Journal of Construction Engineering and Management, v. 132, n. 1 (janvier 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(14)

  8. Wauters, Mathieu / Vanhoucke, Mario (2015): Study of the Stability of Earned Value Management Forecasting. Dans: Journal of Construction Engineering and Management, v. 141, n. 4 (avril 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000947

  9. Wauters, Mathieu / Vanhoucke, Mario (2014): Support Vector Machine Regression for project control forecasting. Dans: Automation in Construction, v. 47 (novembre 2014).

    https://doi.org/10.1016/j.autcon.2014.07.014

  10. Batselier, Jordy / Vanhoucke, Mario (2015): Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost. Dans: Journal of Construction Engineering and Management, v. 141, n. 11 (novembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001008

  11. Colin, Jeroen / Vanhoucke, Mario (2016): Empirical Perspective on Activity Durations for Project-Management Simulation Studies. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001022

  12. Martens, Annelies / Vanhoucke, Mario (2018): An empirical validation of the performance of project control tolerance limits. Dans: Automation in Construction, v. 89 (mai 2018).

    https://doi.org/10.1016/j.autcon.2018.01.002

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine