Mario Vanhoucke
- A multiproject scheduling and resource management model in projects construction. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022). (2022):
- Stability and accuracy of deterministic project duration forecasting methods in earned value management. Dans: Engineering, Construction and Architectural Management. :
- A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Dans: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020). (2020):
- Integrating Corrective Actions in Project Time Forecasting Using Exponential Smoothing. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 5 (septembre 2020). (2020):
- Performance comparison of activity sensitivity metrics in schedule risk analysis. Dans: Automation in Construction, v. 106 (octobre 2019). (2019):
- Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. Dans: Automation in Construction, v. 99 (mars 2019). (2019):
- Work Continuity Constraints in Project Scheduling. Dans: Journal of Construction Engineering and Management, v. 132, n. 1 (janvier 2006). (2006):
- Study of the Stability of Earned Value Management Forecasting. Dans: Journal of Construction Engineering and Management, v. 141, n. 4 (avril 2015). (2015):
- Support Vector Machine Regression for project control forecasting. Dans: Automation in Construction, v. 47 (novembre 2014). (2014):
- Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost. Dans: Journal of Construction Engineering and Management, v. 141, n. 11 (novembre 2015). (2015):
- Empirical Perspective on Activity Durations for Project-Management Simulation Studies. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016). (2016):
- An empirical validation of the performance of project control tolerance limits. Dans: Automation in Construction, v. 89 (mai 2018). (2018):