Stability and accuracy of deterministic project duration forecasting methods in earned value management
Auteur(s): |
Alexis Barrientos-Orellana
Pablo Ballesteros-Pérez Daniel Mora-Melià María Carmen González-Cruz Mario Vanhoucke |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-12-2020-1045 |