- (2023): Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Dans: Buildings, v. 13, n. 5 (27 avril 2023).
- Stability and accuracy of deterministic project duration forecasting methods in earned value management. Dans: Engineering, Construction and Architectural Management. :
- (2017): Structural Resistance of Reinforced Concrete Buildings in Areas of Moderate Seismicity and Assessment of Strategies for Structural Improvement. Dans: Buildings, v. 7, n. 4 (janvier 2017).
- Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects. Dans: Automation in Construction, v. 103 (juillet 2019). (2019):
- Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. Dans: Automation in Construction, v. 84 (décembre 2017). (2017):
- Human Resource Allocation to Multiple Projects Based on Members' Expertise, Group Heterogeneity, and Social Cohesion. Dans: Journal of Construction Engineering and Management, v. 145, n. 2 (février 2019). (2019):