- (2023): Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. In: Buildings, v. 13, n. 5 (27 April 2023).
- Stability and accuracy of deterministic project duration forecasting methods in earned value management. In: Engineering, Construction and Architectural Management. :
- (2017): Structural Resistance of Reinforced Concrete Buildings in Areas of Moderate Seismicity and Assessment of Strategies for Structural Improvement. In: Buildings, v. 7, n. 4 (Januar 2017).
- Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects. In: Automation in Construction, v. 103 (Juli 2019). (2019):
- Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. In: Automation in Construction, v. 84 (Dezember 2017). (2017):
- Human Resource Allocation to Multiple Projects Based on Members' Expertise, Group Heterogeneity, and Social Cohesion. In: Journal of Construction Engineering and Management, v. 145, n. 2 (Februar 2019). (2019):