-
Chen, Wei-Cheng / Tserng, H. Ping (2022): Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices. In: Automation in Construction, v. 134 (February 2022).
https://doi.org/10.1016/j.autcon.2021.104051
-
Tserng, H. Ping / Chung, Chin-Lung (2007): Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan. In: Journal of Infrastructure Systems, v. 13, n. 3 (September 2007).
https://doi.org/10.1061/(asce)1076-0342(2007)13:3(235)
-
Tserng, H. Ping / Lee, Meng-Hsueh / Hsieh, Shang-Hsien / Liu, Hsiang-Ling (2016): The Measurement Factor of Employee Participation for Knowledge Management System in Engineering Consulting Firms. In: Journal of Civil Engineering and Management, v. 22, n. 2 (March 2016).
https://doi.org/10.3846/13923730.2014.897963
-
Yin, Samuel Yen-Liang / Tserng, H. Ping / Toong, Shih Ning / Ngo, Thanh Long (2014): An Improved Approach To the Subcontracting Procurement Process in A Lean Construction Setting. In: Journal of Civil Engineering and Management, v. 20, n. 3 (June 2014).
https://doi.org/10.3846/13923730.2013.801900
-
Tserng, H. Ping / Chen, Po-Cheng / Huang, Wen-Haw / Lei, Man Cheng / Tran, Quang Hung (2014): Prediction of Default Probability for Construction Firms Using the Logit Model. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014).
https://doi.org/10.3846/13923730.2013.801886
-
Tserng, H. Ping / Yin, Samuel Yen-Liang / Lee, Meng-Hsueh (2010): The Use of Knowledge Map Model in Construction Industry. In: Journal of Civil Engineering and Management, v. 16, n. 3 (September 2010).
https://doi.org/10.3846/jcem.2010.38
-
Tserng, H. Ping / Liao, Hsien-Hsing / Jaselskis, Edward J. / Tsai, L. Ken / Chen, Po-Cheng (2012): Predicting Construction Contractor Default with Barrier Option Model. In: Journal of Construction Engineering and Management, v. 138, n. 5 (May 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000465
-
Tserng, H. Ping / Yin, Samuel Y. L. / Li, Sherman (2006): Developing a Resource Supply Chain Planning System for Construction Projects. In: Journal of Construction Engineering and Management, v. 132, n. 4 (April 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:4(393)
-
Tserng, H. Ping / Liao, Hsien-Hsing / Tsai, L. Ken / Chen, Po-Cheng (2011): Predicting Construction Contractor Default with Option-Based Credit Models—Models' Performance and Comparison with Financial Ratio Models. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000311
-
Huang, Wen-Haw / Tserng, H. Ping / Jaselskis, Edward J. / Lee, Shu-Yi (2014): Dynamic Threshold Cash Flow–Based Structural Model for Contractor Financial Prequalification. In: Journal of Construction Engineering and Management, v. 140, n. 10 (October 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000902
-
Tserng, H. Ping / Russell, Jeffrey S. (2002): A 3-D Graphical Database System for Landfill Operations Using GPS. In: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 5 (September 2002).
https://doi.org/10.1111/1467-8667.00280
-
Tserng, H. Ping / Dzeng, Ren-Jye / Lin, Yu-Cheng / Lin, Sheng-Tai (2005): Mobile Construction Supply Chain Management Using PDA and Bar Codes. In: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (July 2005).
https://doi.org/10.1111/j.1467-8667.2005.00391
-
Tserng, H. Ping / Yin, Samuel Y. L. / Dzeng, R. J. / Wou, B. / Tsai, M. D. / Chen, W. Y. (2009): A study of ontology-based risk management framework of construction projects through project life cycle. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.05.005
-
Tserng, H. Ping / Lin, Gwo-Fong / Tsai, L. Ken / Chen, Po-Cheng (2011): An enforced support vector machine model for construction contractor default prediction. In: Automation in Construction, v. 20, n. 8 (December 2011).
https://doi.org/10.1016/j.autcon.2011.05.007
-
Tserng, H. Ping / Lin, Will Y. (2003): Developing an electronic acquisition model for project scheduling using XML-based information standard. In: Automation in Construction, v. 12, n. 1 (January 2003).
https://doi.org/10.1016/s0926-5805(02)00041-9
-
Yin, Samuel Y. L. / Tserng, H. Ping / Wang, J. C. / Tsai, S. C. (2009): Developing a precast production management system using RFID technology. In: Automation in Construction, v. 18, n. 5 (August 2009).
https://doi.org/10.1016/j.autcon.2009.02.004
-
Tserng, H. Ping / Lin, Yu-Cheng (2004): Developing an activity-based knowledge management system for contractors. In: Automation in Construction, v. 13, n. 6 (November 2004).
https://doi.org/10.1016/j.autcon.2004.05.003
-
Yin, Samuel Y. L. / Tserng, H. Ping / Tsai, M. D. (2008): A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan. In: Automation in Construction, v. 17, n. 5 (July 2008).
https://doi.org/10.1016/j.autcon.2007.10.002
-
Tserng, H. Ping / Yin, Y. L. / Jaselskis, Edward J. / Hung, Wu-Chueh / Lin, Yi-Chieh (2011): Modularization and assembly algorithm for efficient MEP construction. In: Automation in Construction, v. 20, n. 7 (November 2011).
https://doi.org/10.1016/j.autcon.2011.03.002
-
Huang, Wen-Haw / Tserng, H. Ping / Liao, Hsien-Hsing / Yin, Samuel Y. L. / Chen, Po-Cheng / Lei, Man Cheng (2013): Contractor financial prequalification using simulation method based on cash flow model. In: Automation in Construction, v. 35 (November 2013).
https://doi.org/10.1016/j.autcon.2013.05.004
-
Lin, Yu-Cheng / Wang, Lung-Chuang / Tserng, H. Ping (2006): Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan. In: Automation in Construction, v. 15, n. 6 (November 2006).
https://doi.org/10.1016/j.autcon.2005.09.006
-
Tserng, H. Ping / Ran, Bin / Russell, Jeffrey S. (2000): Interactive path planning for multi-equipment landfill operations. In: Automation in Construction, v. 10, n. 1 (November 2000).
https://doi.org/10.1016/s0926-5805(00)00073-x
-
Tserng, H. Ping / Lin, Pao H. (2002): An accelerated subcontracting and procuring model for construction projects. In: Automation in Construction, v. 11, n. 1 (January 2002).
https://doi.org/10.1016/s0926-5805(01)00056-5
-
Tserng, H. Ping / Yin, Samuel Y. L. / Skibniewski, Mirosław J. / Lee, M. H. (2010): Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. In: Journal of Construction Engineering and Management, v. 136, n. 2 (February 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000125
-
Tserng, H. Ping / Teng, Wen-Kuang (2009): Analysing dispute mediation cases of infrastructure projects through project life cycle. In: Structure and Infrastructure Engineering, v. 5, n. 6 (December 2009).
https://doi.org/10.1080/15732470701761189
-
Chang, Chin‐Hsiang / Lin, Yu‐Cheng / Tserng, H. Ping (2008): Distilling and managing engineers' experience in construction projects using a pattern approach. In: Construction Management and Economics, v. 26, n. 3 (March 2008).
https://doi.org/10.1080/01446190701819061
-
Tserng, H. Ping / Chang, Chin-Hsiang (2008): Developing a project knowledge management framework for tunnel construction: lessons learned in Taiwan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (April 2008).
https://doi.org/10.1139/l07-116
-
Tserng, H. Ping / Yin, Samuel Yen-Liang / Chung, Chin-Lung (2009): Maintenance Strategy for Bridge Components on the Basis of Performance. In: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 4 (August 2009).
https://doi.org/10.1061/(asce)0887-3828(2009)23:4(234)
-
Tserng, H. Ping / Russell, Jeffrey S. / Hsu, Ching-Wen / Lin, Chieh (2012): Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000398