  1. Chen, Wei-Cheng / Tserng, H. Ping (2022): Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices. Dans: Automation in Construction, v. 134 (février 2022).

    https://doi.org/10.1016/j.autcon.2021.104051

  2. Tserng, H. Ping / Chung, Chin-Lung (2007): Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan. Dans: Journal of Infrastructure Systems, v. 13, n. 3 (septembre 2007).

    https://doi.org/10.1061/(asce)1076-0342(2007)13:3(235)

  3. Tserng, H. Ping / Lee, Meng-Hsueh / Hsieh, Shang-Hsien / Liu, Hsiang-Ling (2016): The Measurement Factor of Employee Participation for Knowledge Management System in Engineering Consulting Firms. Dans: Journal of Civil Engineering and Management, v. 22, n. 2 (mars 2016).

    https://doi.org/10.3846/13923730.2014.897963

  4. Yin, Samuel Yen-Liang / Tserng, H. Ping / Toong, Shih Ning / Ngo, Thanh Long (2014): An Improved Approach To the Subcontracting Procurement Process in A Lean Construction Setting. Dans: Journal of Civil Engineering and Management, v. 20, n. 3 (juin 2014).

    https://doi.org/10.3846/13923730.2013.801900

  5. Tserng, H. Ping / Chen, Po-Cheng / Huang, Wen-Haw / Lei, Man Cheng / Tran, Quang Hung (2014): Prediction of Default Probability for Construction Firms Using the Logit Model. Dans: Journal of Civil Engineering and Management, v. 20, n. 2 (avril 2014).

    https://doi.org/10.3846/13923730.2013.801886

  6. Tserng, H. Ping / Yin, Samuel Yen-Liang / Lee, Meng-Hsueh (2010): The Use of Knowledge Map Model in Construction Industry. Dans: Journal of Civil Engineering and Management, v. 16, n. 3 (septembre 2010).

    https://doi.org/10.3846/jcem.2010.38

  7. Tserng, H. Ping / Liao, Hsien-Hsing / Jaselskis, Edward J. / Tsai, L. Ken / Chen, Po-Cheng (2012): Predicting Construction Contractor Default with Barrier Option Model. Dans: Journal of Construction Engineering and Management, v. 138, n. 5 (mai 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000465

  8. Tserng, H. Ping / Yin, Samuel Y. L. / Li, Sherman (2006): Developing a Resource Supply Chain Planning System for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 4 (avril 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:4(393)

  9. Tserng, H. Ping / Liao, Hsien-Hsing / Tsai, L. Ken / Chen, Po-Cheng (2011): Predicting Construction Contractor Default with Option-Based Credit Models—Models' Performance and Comparison with Financial Ratio Models. Dans: Journal of Construction Engineering and Management, v. 137, n. 6 (juin 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000311

  10. Huang, Wen-Haw / Tserng, H. Ping / Jaselskis, Edward J. / Lee, Shu-Yi (2014): Dynamic Threshold Cash Flow–Based Structural Model for Contractor Financial Prequalification. Dans: Journal of Construction Engineering and Management, v. 140, n. 10 (octobre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000902

  11. Tserng, H. Ping / Russell, Jeffrey S. (2002): A 3-D Graphical Database System for Landfill Operations Using GPS. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 5 (septembre 2002).

    https://doi.org/10.1111/1467-8667.00280

  12. Tserng, H. Ping / Dzeng, Ren-Jye / Lin, Yu-Cheng / Lin, Sheng-Tai (2005): Mobile Construction Supply Chain Management Using PDA and Bar Codes. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (juillet 2005).

    https://doi.org/10.1111/j.1467-8667.2005.00391

  13. Tserng, H. Ping / Yin, Samuel Y. L. / Dzeng, R. J. / Wou, B. / Tsai, M. D. / Chen, W. Y. (2009): A study of ontology-based risk management framework of construction projects through project life cycle. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).

    https://doi.org/10.1016/j.autcon.2009.05.005

  14. Tserng, H. Ping / Lin, Gwo-Fong / Tsai, L. Ken / Chen, Po-Cheng (2011): An enforced support vector machine model for construction contractor default prediction. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011).

    https://doi.org/10.1016/j.autcon.2011.05.007

  15. Tserng, H. Ping / Lin, Will Y. (2003): Developing an electronic acquisition model for project scheduling using XML-based information standard. Dans: Automation in Construction, v. 12, n. 1 (janvier 2003).

    https://doi.org/10.1016/s0926-5805(02)00041-9

  16. Yin, Samuel Y. L. / Tserng, H. Ping / Wang, J. C. / Tsai, S. C. (2009): Developing a precast production management system using RFID technology. Dans: Automation in Construction, v. 18, n. 5 (août 2009).

    https://doi.org/10.1016/j.autcon.2009.02.004

  17. Tserng, H. Ping / Lin, Yu-Cheng (2004): Developing an activity-based knowledge management system for contractors. Dans: Automation in Construction, v. 13, n. 6 (novembre 2004).

    https://doi.org/10.1016/j.autcon.2004.05.003

  18. Yin, Samuel Y. L. / Tserng, H. Ping / Tsai, M. D. (2008): A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan. Dans: Automation in Construction, v. 17, n. 5 (juillet 2008).

    https://doi.org/10.1016/j.autcon.2007.10.002

  19. Tserng, H. Ping / Yin, Y. L. / Jaselskis, Edward J. / Hung, Wu-Chueh / Lin, Yi-Chieh (2011): Modularization and assembly algorithm for efficient MEP construction. Dans: Automation in Construction, v. 20, n. 7 (novembre 2011).

    https://doi.org/10.1016/j.autcon.2011.03.002

  20. Huang, Wen-Haw / Tserng, H. Ping / Liao, Hsien-Hsing / Yin, Samuel Y. L. / Chen, Po-Cheng / Lei, Man Cheng (2013): Contractor financial prequalification using simulation method based on cash flow model. Dans: Automation in Construction, v. 35 (novembre 2013).

    https://doi.org/10.1016/j.autcon.2013.05.004

  21. Lin, Yu-Cheng / Wang, Lung-Chuang / Tserng, H. Ping (2006): Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan. Dans: Automation in Construction, v. 15, n. 6 (novembre 2006).

    https://doi.org/10.1016/j.autcon.2005.09.006

  22. Tserng, H. Ping / Ran, Bin / Russell, Jeffrey S. (2000): Interactive path planning for multi-equipment landfill operations. Dans: Automation in Construction, v. 10, n. 1 (novembre 2000).

    https://doi.org/10.1016/s0926-5805(00)00073-x

  23. Tserng, H. Ping / Lin, Pao H. (2002): An accelerated subcontracting and procuring model for construction projects. Dans: Automation in Construction, v. 11, n. 1 (janvier 2002).

    https://doi.org/10.1016/s0926-5805(01)00056-5

  24. Tserng, H. Ping / Yin, Samuel Y. L. / Skibniewski, Mirosław J. / Lee, M. H. (2010): Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000125

  25. Tserng, H. Ping / Teng, Wen-Kuang (2009): Analysing dispute mediation cases of infrastructure projects through project life cycle. Dans: Structure and Infrastructure Engineering, v. 5, n. 6 (décembre 2009).

    https://doi.org/10.1080/15732470701761189

  26. Chang, Chin‐Hsiang / Lin, Yu‐Cheng / Tserng, H. Ping (2008): Distilling and managing engineers' experience in construction projects using a pattern approach. Dans: Construction Management and Economics, v. 26, n. 3 (mars 2008).

    https://doi.org/10.1080/01446190701819061

  27. Tserng, H. Ping / Chang, Chin-Hsiang (2008): Developing a project knowledge management framework for tunnel construction: lessons learned in Taiwan. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (avril 2008).

    https://doi.org/10.1139/l07-116

  28. Tserng, H. Ping / Yin, Samuel Yen-Liang / Chung, Chin-Lung (2009): Maintenance Strategy for Bridge Components on the Basis of Performance. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 23, n. 4 (août 2009).

    https://doi.org/10.1061/(asce)0887-3828(2009)23:4(234)

  29. Tserng, H. Ping / Russell, Jeffrey S. / Hsu, Ching-Wen / Lin, Chieh (2012): Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. Dans: Journal of Construction Engineering and Management, v. 138, n. 2 (février 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000398

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine