Ming-Kuan Tsai
- Improving Efficiency in Emergency Response for Construction Site Fires: an Exploratory Case Study. In: Journal of Civil Engineering and Management, v. 22, n. 3 (March 2016). (2016):
- Using Mobile Disaster Response System in Bridge Management. In: Journal of Civil Engineering and Management, v. 20, n. 5 (October 2014). (2014):
- Developing Computer-based Schedule Delay Analysis Methods Based on Information Flow Analysis: A Case Study. In: Journal of Civil Engineering and Management, v. 19, n. 6 (December 2013). (2013):
- Streamlining information representation during construction accidents. In: KSCE Journal of Civil Engineering, v. 18, n. 7 (July 2014). (2014):
- Enhancing post-nuclear temporary housing solutions in Taiwan. In: KSCE Journal of Civil Engineering, v. 19, n. 5 (February 2015). (2015):
- Applying physiological status monitoring in improving construction safety management. In: KSCE Journal of Civil Engineering, v. 21, n. 6 (December 2016). (2016):
- Integrating wireless and speech technologies for synchronous on-site data collection. In: Automation in Construction, v. 16, n. 3 (May 2007). (2007):
- Synchronization-based model for improving on-site data collection performance. In: Automation in Construction, v. 16, n. 3 (May 2007). (2007):
- Computerizing ICBF Method for Schedule Delay Analysis. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011). (2011):