- Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. In: Engineering, Construction and Architectural Management, v. 25, n. 5 (June 2018). (2018):
- Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020). (2020):