Onur B. Tokdemir
- Scheduling system for repetitive unit construction using line‐of‐balance technology. In: Engineering, Construction and Architectural Management, v. 8, n. 2 (February 2001). (2001):
- Challenges in Line-of-Balance Scheduling. In: Journal of Construction Engineering and Management, v. 128, n. 6 (December 2002). (2002):
- Predicting the Outcome of Construction Litigation Using Neural Networks. In: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (March 1998). (1998):
- Scheduling system for high rise building construction. In: Construction Management and Economics, v. 20, n. 4 (June 2002). (2002):
- ALISS: Advanced Linear Scheduling System. In: Construction Management and Economics, v. 24, n. 12 (December 2006). (2006):
- Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation. In: Journal of Construction Engineering and Management, v. 145, n. 2 (February 2019). (2019):