Onur B. Tokdemir
- Scheduling system for repetitive unit construction using line‐of‐balance technology. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- Challenges in Line-of-Balance Scheduling. Dans: Journal of Construction Engineering and Management, v. 128, n. 6 (décembre 2002). (2002):
- Predicting the Outcome of Construction Litigation Using Neural Networks. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (mars 1998). (1998):
- Scheduling system for high rise building construction. Dans: Construction Management and Economics, v. 20, n. 4 (juin 2002). (2002):
- ALISS: Advanced Linear Scheduling System. Dans: Construction Management and Economics, v. 24, n. 12 (décembre 2006). (2006):
- Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation. Dans: Journal of Construction Engineering and Management, v. 145, n. 2 (février 2019). (2019):