Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Auteur(s): |
Onur B. Tokdemir
Huseyin Erol Irem Dikmen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, février 2019, n. 2, v. 145 |
Page(s): | 04018132 |
DOI: | 10.1061/(asce)co.1943-7862.0001595 |
- Informations
sur cette fiche - Reference-ID
10222844 - Publié(e) le:
01.12.2018 - Modifié(e) le:
01.12.2018