The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Raynar, Karl A. / Smith, Gary R. (1993): Intelligent Positioning of Mobile Cranes for Steel Erection. In: Computer-Aided Civil and Infrastructure Engineering, v. 8, n. 1 (January 1993).

    https://doi.org/10.1111/j.1467-8667.1993.tb00193.x

  2. Minchin, R. Edward / Smith, Gary R. (2005): Quality-Based Contractor Rating Model for Qualification and Bidding Purposes. In: Journal of Management in Engineering (ASCE), v. 21, n. 1 (January 2005).

    https://doi.org/10.1061/(asce)0742-597x(2005)21:1(38)

  3. Gao, Zhili / Smith, Gary R. / Minchin, R. Edward (2002): Budget and Schedule Success for Small Capital-Facility Projects. In: Journal of Management in Engineering (ASCE), v. 18, n. 4 (October 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:4(186)

  4. Tilford, Kelly R. / Jaselskis, Edward J. / Smith, Gary R. (2000): Impact of Environmental Contamination on Construction Projects. In: Journal of Construction Engineering and Management, v. 126, n. 1 (January 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:1(45)

  5. Thomas, H. Randolph / Maloney, William F. / Horner, R. Malcolm W. / Smith, Gary R. / Handa, Vir K. / Sanders, Steve R. (1990): Modeling Construction Labor Productivity. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:4(705)

  6. Thomas, H. Randolph / Smith, Gary R. / Wright, Dennis E. (1990): Resolving Disputes over Contract Notice Requirements. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:4(738)

  7. Smith, Gary R. / Hancher, Donn E. (1989): Estimating Precipitation Impacts for Scheduling. In: Journal of Construction Engineering and Management, v. 115, n. 4 (December 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:4(552)

  8. Thomas, H. Randolph / Smith, Gary R. / Wright, E. Dennis (1991): Legal Aspects of Oral Change Orders. In: Journal of Construction Engineering and Management, v. 117, n. 1 (March 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:1(148)

  9. Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Misrepresentations. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:3(472)

  10. Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Differing‐Site‐Condition Clause. In: Journal of Construction Engineering and Management, v. 118, n. 4 (December 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:4(767)

  11. Thomas, H. Randolph / Smith, Gary R. / Mellott, Robert E. (1994): Interpretation of Construction Contracts. In: Journal of Construction Engineering and Management, v. 120, n. 2 (June 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:2(321)

  12. Thomas, H. Randolph / Smith, Gary R. / Wirsching, Steven M. (1995): Understanding Defective Specifications. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:1(55)

  13. Thomas, H. Randolph / Smith, Gary R. / Cummings, Daniel J. (1995): Have I Reached Substantial Completion?. In: Journal of Construction Engineering and Management, v. 121, n. 1 (March 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:1(121)

  14. Thomas, H. Randolph / Smith, Gary R. / Cummings, Daniel J. (1995): Enforcement of Liquidated Damages. In: Journal of Construction Engineering and Management, v. 121, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(459)

  15. Smith, Gary R. / Bohn, Caryn M. (1999): Small to Medium Contractor Contingency and Assumption of Risk. In: Journal of Construction Engineering and Management, v. 125, n. 2 (March 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:2(101)

  16. Hegab, Mohamed / Smith, Gary R. / Salem, Ossama M. (2006): Soil Penetration Modeling in Microtunneling Projects. In: Journal of Construction Engineering and Management, v. 132, n. 6 (June 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:6(598)

  17. Hegab, Mohamed Y. / Smith, Gary R. (2007): Delay Time Analysis in Microtunneling Projects. In: Journal of Construction Engineering and Management, v. 133, n. 2 (February 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:2(191)

  18. Hegab, Mohamed / Smith, Gary R. (2009): Labor Performance Analysis for Microtunneling Projects. In: Journal of Construction Engineering and Management, v. 135, n. 5 (May 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:5(432)

  19. Smith, Gary R. / Hanna, Awad S. (1993): Factors influencing formwork productivity. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 1 (February 1993).

    https://doi.org/10.1139/l93-015

  20. Zayed, Tarek / Minchin, R. Edward / Boyd, Andrew J. / Smith, Gary R. / McVay, Michael C. (2007): Model for the Physical Risk Assessment of Bridges with Unknown Foundation. In: Journal of Performance of Constructed Facilities (ASCE), v. 21, n. 1 (February 2007).

    https://doi.org/10.1061/(asce)0887-3828(2007)21:1(44)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine