-
Raynar, Karl A. / Smith, Gary R. (1993): Intelligent Positioning of Mobile Cranes for Steel Erection. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 8, n. 1 (janvier 1993).
https://doi.org/10.1111/j.1467-8667.1993.tb00193.x
-
Minchin, R. Edward / Smith, Gary R. (2005): Quality-Based Contractor Rating Model for Qualification and Bidding Purposes. Dans: Journal of Management in Engineering (ASCE), v. 21, n. 1 (janvier 2005).
https://doi.org/10.1061/(asce)0742-597x(2005)21:1(38)
-
Gao, Zhili / Smith, Gary R. / Minchin, R. Edward (2002): Budget and Schedule Success for Small Capital-Facility Projects. Dans: Journal of Management in Engineering (ASCE), v. 18, n. 4 (octobre 2002).
https://doi.org/10.1061/(asce)0742-597x(2002)18:4(186)
-
Tilford, Kelly R. / Jaselskis, Edward J. / Smith, Gary R. (2000): Impact of Environmental Contamination on Construction Projects. Dans: Journal of Construction Engineering and Management, v. 126, n. 1 (janvier 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:1(45)
-
Thomas, H. Randolph / Maloney, William F. / Horner, R. Malcolm W. / Smith, Gary R. / Handa, Vir K. / Sanders, Steve R. (1990): Modeling Construction Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 116, n. 4 (décembre 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(705)
-
Thomas, H. Randolph / Smith, Gary R. / Wright, Dennis E. (1990): Resolving Disputes over Contract Notice Requirements. Dans: Journal of Construction Engineering and Management, v. 116, n. 4 (décembre 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(738)
-
Smith, Gary R. / Hancher, Donn E. (1989): Estimating Precipitation Impacts for Scheduling. Dans: Journal of Construction Engineering and Management, v. 115, n. 4 (décembre 1989).
https://doi.org/10.1061/(asce)0733-9364(1989)115:4(552)
-
Thomas, H. Randolph / Smith, Gary R. / Wright, E. Dennis (1991): Legal Aspects of Oral Change Orders. Dans: Journal of Construction Engineering and Management, v. 117, n. 1 (mars 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:1(148)
-
Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Misrepresentations. Dans: Journal of Construction Engineering and Management, v. 118, n. 3 (septembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:3(472)
-
Thomas, H. Randolph / Smith, Gary R. / Ponderlick, R. Martin (1992): Resolving Contract Disputes Based on Differing‐Site‐Condition Clause. Dans: Journal of Construction Engineering and Management, v. 118, n. 4 (décembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:4(767)
-
Thomas, H. Randolph / Smith, Gary R. / Mellott, Robert E. (1994): Interpretation of Construction Contracts. Dans: Journal of Construction Engineering and Management, v. 120, n. 2 (juin 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:2(321)
-
Thomas, H. Randolph / Smith, Gary R. / Wirsching, Steven M. (1995): Understanding Defective Specifications. Dans: Journal of Construction Engineering and Management, v. 121, n. 1 (mars 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:1(55)
-
Thomas, H. Randolph / Smith, Gary R. / Cummings, Daniel J. (1995): Have I Reached Substantial Completion?. Dans: Journal of Construction Engineering and Management, v. 121, n. 1 (mars 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:1(121)
-
Thomas, H. Randolph / Smith, Gary R. / Cummings, Daniel J. (1995): Enforcement of Liquidated Damages. Dans: Journal of Construction Engineering and Management, v. 121, n. 4 (décembre 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:4(459)
-
Smith, Gary R. / Bohn, Caryn M. (1999): Small to Medium Contractor Contingency and Assumption of Risk. Dans: Journal of Construction Engineering and Management, v. 125, n. 2 (mars 1999).
https://doi.org/10.1061/(asce)0733-9364(1999)125:2(101)
-
Hegab, Mohamed / Smith, Gary R. / Salem, Ossama M. (2006): Soil Penetration Modeling in Microtunneling Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 6 (juin 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:6(598)
-
Hegab, Mohamed Y. / Smith, Gary R. (2007): Delay Time Analysis in Microtunneling Projects. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:2(191)
-
Hegab, Mohamed / Smith, Gary R. (2009): Labor Performance Analysis for Microtunneling Projects. Dans: Journal of Construction Engineering and Management, v. 135, n. 5 (mai 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:5(432)
-
Smith, Gary R. / Hanna, Awad S. (1993): Factors influencing formwork productivity. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 1 (février 1993).
https://doi.org/10.1139/l93-015
-
Zayed, Tarek / Minchin, R. Edward / Boyd, Andrew J. / Smith, Gary R. / McVay, Michael C. (2007): Model for the Physical Risk Assessment of Bridges with Unknown Foundation. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 21, n. 1 (février 2007).
https://doi.org/10.1061/(asce)0887-3828(2007)21:1(44)