• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Bendi, Deepthi / Rana, Muhammad Qasim / Arif, Mohammed / Goulding, Jack Steven / Sawhney, Anil: An off-site construction readiness maturity model for the Indian construction sector. In: Construction Innovation.

    https://doi.org/10.1108/ci-07-2020-0121

  2. Mittal, Yash Kumar / Paul, Virendra Kumar / Rostami, Ali / Riley, Michael / Sawhney, Anil (2020): Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries. In: Asian Journal of Civil Engineering, v. 21, n. 4 (February 2020).

    https://doi.org/10.1007/s42107-020-00227-1

  3. Sawhney, Anil / Agnihotri, Raghav / Paul, Virendra Kumar (2014): Grand challenges for the Indian construction industry. In: Built Environment Project and Asset Management, v. 4, n. 4 (September 2014).

    https://doi.org/10.1108/bepam-10-2013-0055

  4. Singh, Manav Mahan / Sawhney, Anil / Sharma, Vaishnavi (2017): Utilising Building Component Data from BIM for Formwork Planning. In: Construction Economics and Building, v. 17, n. 4 (December 2017).

    https://doi.org/10.5130/ajceb.v17i4.5546

  5. Alkilani, Suhair Zaid / Jupp, Julie / Sawhney, Anil (2013): Issues of construction health and safety in developing countries: a case of Jordan. In: Australasian Journal of Construction Economics and Building, v. 13, n. 3 (September 2013).

    https://doi.org/10.5130/ajceb.v13i3.3301

  6. Mittal, Yash Kumar / Paul, Virendra Kumar / Sawhney, Anil (2019): Methodology for Estimating the Cost of Delay in Architectural Engineering Projects: Case of Metro Rails in India. In: Journal of The Institution of Engineers (India): Series A, v. 100, n. 2 (February 2019).

    https://doi.org/10.1007/s40030-019-00366-y

  7. Ahuja, Ritu / Jain, Megha / Sawhney, Anil / Arif, Mohammed (2016): Adoption of BIM by architectural firms in India: technology–organization–environment perspective. In: Architectural Engineering and Design Management, v. 12, n. 4 (May 2016).

    https://doi.org/10.1080/17452007.2016.1186589

  8. Sawhney, Anil / AbouRizk, Simaan M. (1996): Computerized Tool for Hierarchical Simulation Modeling. In: Journal of Computing in Civil Engineering, v. 10, n. 2 (April 1996).

    https://doi.org/10.1061/(asce)0887-3801(1996)10:2(115)

  9. Sawhney, Anil / Abudayyeh, Osama / Chaitavatputtiporn, Tavatchai (1999): Modeling and Analysis of Concrete Production Plant Using Petri Nets. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(178)

  10. Kovvuri, P. Ramachandra Reddy / Sawhney, Anil / Ahuja, Ritu / Sreekumar, Aiswarya (2016): Efficient Project Delivery Using Lean Principles - An Indian Case Study. In: Journal of The Institution of Engineers (India): Series A, v. 97, n. 1 (March 2016).

    https://doi.org/10.1007/s40030-016-0142-6

  11. Sawhney, Anil / AbouRizk, Simaan M. (1995): HSM-Simulation–Based Planning Method for Construction Projects. In: Journal of Construction Engineering and Management, v. 121, n. 3 (September 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:3(297)

  12. Sawhney, Anil / Mund, André (2002): Adaptive Probabilistic Neural Network-based Crane Type Selection System. In: Journal of Construction Engineering and Management, v. 128, n. 3 (June 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(265)

  13. Bashford, Howard H. / Sawhney, Anil / Walsh, Kenneth D. / Kot, Kunal (2003): Implications of Even Flow Production Methodology for U.S. Housing Industry. In: Journal of Construction Engineering and Management, v. 129, n. 3 (June 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:3(330)

  14. Bashford, Howard H. / Walsh, Kenneth D. / Sawhney, Anil (2005): Production System Loading–Cycle Time Relationship in Residential Construction. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(15)

  15. Walsh, Kenneth D. / Sawhney, Anil / Bashford, Howard H. (2007): Production Equations for Unsteady-State Construction Processes. In: Journal of Construction Engineering and Management, v. 133, n. 3 (March 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:3(254)

  16. Sawhney, Anil / Walsh, Kenneth D. / Brown IV, Audrick (2004): International comparison of cost for the construction sector: towards a conceptual model. In: Civil Engineering and Environmental Systems, v. 21, n. 3 (September 2004).

    https://doi.org/10.1080/10286600410001665644

  17. Sawhney, Anil / Mund, André / Chaitavatputtiporn, Tavatchai (2003): Petri net-based scheduling of construction projects. In: Civil Engineering and Environmental Systems, v. 20, n. 4 (December 2003).

    https://doi.org/10.1080/10286600310001633848

  18. Sawhney, Anil / Mund, André (1999): Hierarchical And Modular Modeling Of Structural Steel Erection Process Using Petri Nets. In: Civil Engineering and Environmental Systems, v. 17, n. 1 (December 1999).

    https://doi.org/10.1080/02630259908970274

  19. Walsh, Kenneth D. / Sawhney, Anil / Brown, Audrick (2005): International Comparison of Cost for the Construction Sector: Purchasing Power Parity. In: Journal of Construction Engineering and Management, v. 131, n. 2 (February 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:2(160)

  20. Sawhney, Anil / Walsh, Kenneth D. / Bashford, Howard H. / Palaniappan, Sivakumar (2009): Impact of Inspected Buffers on Production Parameters of Construction Processes. In: Journal of Construction Engineering and Management, v. 135, n. 4 (April 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:4(319)

  21. Sawhney, Anil / Mund, André (2001): IntelliCranes: an integrated crane type and model selection system. In: Construction Management and Economics, v. 19, n. 2 (March 2001).

    https://doi.org/10.1080/01446190010008079

  22. Sawhney, Anil / AbouRizk, Simaan M. / Halpin, Daniel W. (1998): Construction project simulation using CYCLONE. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 1 (February 1998).

    https://doi.org/10.1139/l97-047

  23. AbouRizk, Simaan M. / Sawhney, Anil (1993): Subjective and interactive duration estimation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 3 (June 1993).

    https://doi.org/10.1139/l93-060

  24. Sawhney, Anil / Mund, André / Syal, Matt (2002): Energy-Efficiency Strategies for Construction of Five Star Plus Homes. In: Practice Periodical on Structural Design and Construction, v. 7, n. 4 (November 2002).

    https://doi.org/10.1061/(asce)1084-0680(2002)7:4(174)

  25. Walsh, Kenneth D. / Bashford, Howard H. / Sawhney, Anil / Witjakso, Andreas (2004): Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains. In: Journal of Architectural Engineering (ASCE), v. 10, n. 3 (September 2004).

    https://doi.org/10.1061/(asce)1076-0431(2004)10:3(112)

  26. Abudayyeh, Osama / Sawhney, Anil / El-Bibany, Hossam / Buchanan, David (1998): Concrete Bridge Demolition Methods and Equipment. In: Journal of Bridge Engineering (ASCE), v. 3, n. 3 (August 1998).

    https://doi.org/10.1061/(asce)1084-0702(1998)3:3(117)

Search for a publication...

Only available with
My Structurae

Premium Partnerships