Singh, Manav Mahan / Sawhney, Anil / Borrmann, André (2015): Modular Coordination and BIM: Development of Rule Based Smart Building Components. Dans: Procedia Engineering, v. 123 ( 2015).
https://doi.org/10.1016/j.proeng.2015.10.104
-
Bendi, Deepthi / Rana, Muhammad Qasim / Arif, Mohammed / Lamb, Steve Michael / Sawhney, Anil / Kaushik, Amit Kant (2021): Assessing off-site readiness in construction organisations: cases from India. Dans: Construction Innovation, v. 22, n. 2 (octobre 2021).
https://doi.org/10.1108/ci-01-2021-0005
-
Kahhat, Ramzy / Crittenden, John / Sharif, Fariya / Fonseca, Ernesto / Li, Ke / Sawhney, Anil / Zhang, Peng (2009): Environmental Impacts over the Life Cycle of Residential Buildings Using Different Exterior Wall Systems. Dans: Journal of Infrastructure Systems, v. 15, n. 3 (septembre 2009).
https://doi.org/10.1061/(asce)1076-0342(2009)15:3(211)
-
Dharmapuri Tirumala, Venkata Raghu Rama Swamy / Tiwari, Piyush / Sawhney, Anil / Kodumudi Pranatharthiharan, Krishnan (2020): Analyzing Configurational Paths for Successful PPPs in Indian Urban Drinking Water Sector. Dans: Journal of Infrastructure Systems, v. 26, n. 3 (septembre 2020).
https://doi.org/10.1061/(asce)is.1943-555x.0000557
-
Walsh, Kenneth D. / Sawhney, Anil / Vachris, Michelle A. (2006): Improving inter‐spatial comparison of construction costs. Dans: Engineering, Construction and Architectural Management, v. 13, n. 2 (mars 2006).
https://doi.org/10.1108/09699980610659599
-
Ahuja, Ritu / Sawhney, Anil / Arif, Mohammed (2018): Developing organizational capabilities to deliver lean and green project outcomes using BIM. Dans: Engineering, Construction and Architectural Management, v. 25, n. 10 (novembre 2018).
https://doi.org/10.1108/ecam-08-2017-0175
-
Bendi, Deepthi / Rana, Muhammad Qasim / Arif, Mohammed / Goulding, Jack Steven / Sawhney, Anil (2021): An off-site construction readiness maturity model for the Indian construction sector. Dans: Construction Innovation, v. 21, n. 1 (4 janvier 2021).
https://doi.org/10.1108/ci-07-2020-0121
-
Mittal, Yash Kumar / Paul, Virendra Kumar / Rostami, Ali / Riley, Michael / Sawhney, Anil (2020): Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries. Dans: Asian Journal of Civil Engineering, v. 21, n. 4 (février 2020).
https://doi.org/10.1007/s42107-020-00227-1
-
Sawhney, Anil / Agnihotri, Raghav / Paul, Virendra Kumar (2014): Grand challenges for the Indian construction industry. Dans: Built Environment Project and Asset Management, v. 4, n. 4 (septembre 2014).
https://doi.org/10.1108/bepam-10-2013-0055
-
Alkilani, Suhair Zaid / Jupp, Julie / Sawhney, Anil (2013): Issues of construction health and safety in developing countries: a case of Jordan. Dans: Australasian Journal of Construction Economics and Building, v. 13, n. 3 (septembre 2013).
https://doi.org/10.5130/ajceb.v13i3.3301
-
Mittal, Yash Kumar / Paul, Virendra Kumar / Sawhney, Anil (2019): Methodology for Estimating the Cost of Delay in Architectural Engineering Projects: Case of Metro Rails in India. Dans: Journal of The Institution of Engineers (India): Series A, v. 100, n. 2 (février 2019).
https://doi.org/10.1007/s40030-019-00366-y
-
Ahuja, Ritu / Jain, Megha / Sawhney, Anil / Arif, Mohammed (2016): Adoption of BIM by architectural firms in India: technology–organization–environment perspective. Dans: Architectural Engineering and Design Management, v. 12, n. 4 (mai 2016).
https://doi.org/10.1080/17452007.2016.1186589
-
Sawhney, Anil / AbouRizk, Simaan M. (1996): Computerized Tool for Hierarchical Simulation Modeling. Dans: Journal of Computing in Civil Engineering, v. 10, n. 2 (avril 1996).
https://doi.org/10.1061/(asce)0887-3801(1996)10:2(115)
-
Sawhney, Anil / Abudayyeh, Osama / Chaitavatputtiporn, Tavatchai (1999): Modeling and Analysis of Concrete Production Plant Using Petri Nets. Dans: Journal of Computing in Civil Engineering, v. 13, n. 3 (juillet 1999).
https://doi.org/10.1061/(asce)0887-3801(1999)13:3(178)
-
Kovvuri, P. Ramachandra Reddy / Sawhney, Anil / Ahuja, Ritu / Sreekumar, Aiswarya (2016): Efficient Project Delivery Using Lean Principles - An Indian Case Study. Dans: Journal of The Institution of Engineers (India): Series A, v. 97, n. 1 (mars 2016).
https://doi.org/10.1007/s40030-016-0142-6
-
Sawhney, Anil / AbouRizk, Simaan M. (1995): HSM-Simulation–Based Planning Method for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 121, n. 3 (septembre 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:3(297)
-
Sawhney, Anil / Mund, André (2002): Adaptive Probabilistic Neural Network-based Crane Type Selection System. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:3(265)
-
Bashford, Howard H. / Sawhney, Anil / Walsh, Kenneth D. / Kot, Kunal (2003): Implications of Even Flow Production Methodology for U.S. Housing Industry. Dans: Journal of Construction Engineering and Management, v. 129, n. 3 (juin 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:3(330)
-
Bashford, Howard H. / Walsh, Kenneth D. / Sawhney, Anil (2005): Production System Loading–Cycle Time Relationship in Residential Construction. Dans: Journal of Construction Engineering and Management, v. 131, n. 1 (janvier 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:1(15)
-
Walsh, Kenneth D. / Sawhney, Anil / Bashford, Howard H. (2007): Production Equations for Unsteady-State Construction Processes. Dans: Journal of Construction Engineering and Management, v. 133, n. 3 (mars 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:3(254)
-
Sawhney, Anil / Walsh, Kenneth D. / Brown IV, Audrick (2004): International comparison of cost for the construction sector: towards a conceptual model. Dans: Civil Engineering and Environmental Systems, v. 21, n. 3 (septembre 2004).
https://doi.org/10.1080/10286600410001665644
-
Sawhney, Anil / Mund, André / Chaitavatputtiporn, Tavatchai (2003): Petri net-based scheduling of construction projects. Dans: Civil Engineering and Environmental Systems, v. 20, n. 4 (décembre 2003).
https://doi.org/10.1080/10286600310001633848
-
Sawhney, Anil / Mund, André (1999): Hierarchical And Modular Modeling Of Structural Steel Erection Process Using Petri Nets. Dans: Civil Engineering and Environmental Systems, v. 17, n. 1 (décembre 1999).
https://doi.org/10.1080/02630259908970274
-
Walsh, Kenneth D. / Sawhney, Anil / Brown, Audrick (2005): International Comparison of Cost for the Construction Sector: Purchasing Power Parity. Dans: Journal of Construction Engineering and Management, v. 131, n. 2 (février 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:2(160)
-
Sawhney, Anil / Walsh, Kenneth D. / Bashford, Howard H. / Palaniappan, Sivakumar (2009): Impact of Inspected Buffers on Production Parameters of Construction Processes. Dans: Journal of Construction Engineering and Management, v. 135, n. 4 (avril 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:4(319)
-
Sawhney, Anil / Mund, André (2001): IntelliCranes: an integrated crane type and model selection system. Dans: Construction Management and Economics, v. 19, n. 2 (mars 2001).
https://doi.org/10.1080/01446190010008079
-
Sawhney, Anil / AbouRizk, Simaan M. / Halpin, Daniel W. (1998): Construction project simulation using CYCLONE. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 1 (février 1998).
https://doi.org/10.1139/l97-047
-
Sawhney, Anil / Mund, André / Syal, Matt (2002): Energy-Efficiency Strategies for Construction of Five Star Plus Homes. Dans: Practice Periodical on Structural Design and Construction, v. 7, n. 4 (novembre 2002).
https://doi.org/10.1061/(asce)1084-0680(2002)7:4(174)
-
Walsh, Kenneth D. / Bashford, Howard H. / Sawhney, Anil / Witjakso, Andreas (2004): Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains. Dans: Journal of Architectural Engineering (ASCE), v. 10, n. 3 (septembre 2004).
https://doi.org/10.1061/(asce)1076-0431(2004)10:3(112)
-
Abudayyeh, Osama / Sawhney, Anil / El-Bibany, Hossam / Buchanan, David (1998): Concrete Bridge Demolition Methods and Equipment. Dans: Journal of Bridge Engineering (ASCE), v. 3, n. 3 (août 1998).
https://doi.org/10.1061/(asce)1084-0702(1998)3:3(117)