0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rainer Rengshausen

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Rengshausen, Rainer / Weiner, Thorsten (2018): Metro Doha Green Line - More than 30 km of tunnel in 18 months. In: Geomechanics and Tunnelling, v. 11, n. 1 (February 2018).

    https://doi.org/10.1002/geot.201700061

  2. Köhler, Hans / Rengshausen, Rainer (2016): Metro Doha Green Line - EPB TBM tunnelling under very special circumstances / Metro Doha Green Line - EPB-Vortriebe unter Berücksichtigung sehr spezieller Randbedingungen. In: Geomechanics and Tunnelling, v. 9, n. 5 ( 2016).

    https://doi.org/10.1002/geot.201600047

  3. Köhler, Hans / Rengshausen, Rainer (2014): Doha Metro Green Line - Six tunnel boring machines in the starting phase / Metro Doha Green Line - Sechs Tunnelvortriebsmaschinen in der Startphase. In: Geomechanics and Tunnelling, v. 7, n. 6 ( 2014).

    https://doi.org/10.1002/geot.201400060

  4. Rengshausen, Rainer / Tauriainen, Riku / Raedle, Andreas (2014): TBM and spoil treatment selection process - case history Crossrail C310 Thames Tunnel. Slurry TBM versus EPB TBM. In: Geomechanics and Tunnelling, v. 7, n. 1 ( 2014).

    https://doi.org/10.1002/geot.201400001

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine