0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Thomas Pilgerstorfer

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Purucker, Martin / Kaltenböck, Anton / Pilgerstorfer, Thomas / Schnabl, Robert (2024): Probabilistic analysis for the stability assessment of high rock slopes on the S10 Mühlviertler expressway project – Freistadt Nord section. In: Geomechanics and Tunnelling, v. 17, n. 5 (October 2024).

    https://doi.org/10.1002/geot.202400049

  2. Razgordanisharahi, Ali / Sorgner, Maximilian / Pilgerstorfer, Thomas / Moritz, Bernd / Hellmich, Christian / Pichler, Bernhard L. A. (2024): Realistic long-term stress levels in a deep segmented tunnel lining, from hereditary mechanics-informed evaluation of strain measurements. In: Tunnelling and Underground Space Technology, v. 145 (March 2024).

    https://doi.org/10.1016/j.tust.2024.105602

  3. Boch, Ronny / Pilgerstorfer, Thomas / Moritz, Bernd (2022): Reduzierung von Versinterung durch optimierte Drainagebedingungen – Erkenntnisse eines Feldversuchs. In: Geomechanics and Tunnelling, v. 15, n. 4 (August 2022).

    https://doi.org/10.1002/geot.202200011

  4. Pilgerstorfer, Thomas / Hölzl, Harald / Moritz, Bernd (2020): Passing a major fault zone three times: NATM helps TBM to succeed. In: Geomechanics and Tunnelling, v. 13, n. 5 (October 2020).

    https://doi.org/10.1002/geot.202000030

  5. Hölzl, Harald / Pilgerstorfer, Thomas / Uschan, Robert / Wagner, Hanns / Moritz, Bernd (2017): Koralmtunnel underground emergency stop - Geotechnical design and construction. In: Geomechanics and Tunnelling, v. 10, n. 6 (November 2017).

    https://doi.org/10.1002/geot.201700055

  6. Moritz, Bernd / Pilgerstorfer, Thomas / Pointner, Peter (2017): Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment. In: Geomechanics and Tunnelling, v. 10, n. 5 (October 2017).

    https://doi.org/10.1002/geot.201700038

  7. Moritz, Bernd / Pilgerstorfer, Thomas / Pointner, Peter (2015): Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015).

    https://doi.org/10.1002/geot.201500040

  8. Pilgerstorfer, Thomas / Radončić, N. / Moritz, Bernd / Goricki, Andreas (2011): Evaluation and interpretation of monitoring data in the test adit EKT Paierdorf / Auswertung und Interpretation der Messdaten aus dem Versuchsstollen EKT Paierdorf. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011).

    https://doi.org/10.1002/geot.201100036

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine