Thomas Pilgerstorfer
- Probabilistic analysis for the stability assessment of high rock slopes on the S10 Mühlviertler expressway project – Freistadt Nord section. In: Geomechanics and Tunnelling, v. 17, n. 5 (Oktober 2024). (2024):
- Realistic long-term stress levels in a deep segmented tunnel lining, from hereditary mechanics-informed evaluation of strain measurements. In: Tunnelling and Underground Space Technology, v. 145 (März 2024). (2024):
- Reduzierung von Versinterung durch optimierte Drainagebedingungen – Erkenntnisse eines Feldversuchs. In: Geomechanics and Tunnelling, v. 15, n. 4 (August 2022). (2022):
- Passing a major fault zone three times: NATM helps TBM to succeed. In: Geomechanics and Tunnelling, v. 13, n. 5 (Oktober 2020). (2020):
- Koralmtunnel underground emergency stop - Geotechnical design and construction. In: Geomechanics and Tunnelling, v. 10, n. 6 (November 2017). (2017):
- Koralm Tunnel contract KAT3 - System behaviour in a geotechnically challenging environment. In: Geomechanics and Tunnelling, v. 10, n. 5 (Oktober 2017). (2017):
- Experience of conventional excavation in crystalline rock mass on Koralm Tunnel contract KAT3 / Erfahrungen beim zyklischen Vortrieb im Kristallinabschnitt des Bauloses KAT3. In: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015). (2015):
- Evaluation and interpretation of monitoring data in the test adit EKT Paierdorf / Auswertung und Interpretation der Messdaten aus dem Versuchsstollen EKT Paierdorf. In: Geomechanics and Tunnelling, v. 4, n. 5 ( 2011). (2011):