- Post-occupancy evaluation (POE) of high-rise flats built using prefabricated prefinished volumetric construction (PPVC). In: International Journal of Building Pathology and Adaptation. :
- Critical success factors for BIM adoption during construction phase: a Singapore case study. In: Engineering, Construction and Architectural Management, v. 29, n. 9 (August 2022). (2022):