- Post-occupancy evaluation (POE) of high-rise flats built using prefabricated prefinished volumetric construction (PPVC). Dans: International Journal of Building Pathology and Adaptation. :
- Critical success factors for BIM adoption during construction phase: a Singapore case study. Dans: Engineering, Construction and Architectural Management, v. 29, n. 9 (août 2022). (2022):